Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering av produktionsflöde för att minska ledtiden: En fallstudie på en tillverkande verkstad för identifiering avförbättringsområden av en halvautomatiserad produktionslina
2025 (Swedish)Independent thesis Basic level (university diploma), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Optimization of the production flow to reduce lead time : A case study at a manufacturing workshop factory to identify areas of improvement for a semi-automatic production line (English)
Abstract [sv]

Små och medelstora företag (SME) är vitala för den europeiska ekonomin men konkurrensen ökar och ledtiden spelar en allt viktigare roll. Kunder är villiga att köpa ett företags produkter om pris, kvalitet och leveranssäkerhet är konkurrenskraftiga. Lean och olika kvalitetsverktyg har växt fram för att kunna möta kunderna i detta, och att undersöka hur SME kan implementera konkreta förbättringar i sin verksamhet med olika förbättringsverktyg är av stort intresse.

Syftet med denna rapport har varit att minska en tillverkande verkstads produktionsledtid för en produktionslina. Rapporten kommer redovisa hur ett effektivare flöde kan skapas bland annat genom att skapa en förbättringsgrupp tillsammans med medarbetare i fallföretaget och därmed implementera ett standardiserat arbetssätt.

Inledningsvis genomfördes en kartläggning av nuläget där värdeflödesanalyser, observationer, tidsstudier och intervjuer tillämpades. Resultatet visade att produktionsflödet lider av omfattande slöserier, framför allt i form av väntetider och bristande flöde i produktionslinan. Det kunde genom teoretiska beräkningar konstateras att linan även vid maximala cykeltider kan uppnå produktionsmålet, och linan ansågs därmed inte vara begränsande.

För att standardisera arbetssättet skapades en arbetsbeskrivning tillsammans med förbättringsgruppen, och två fullskaliga test genomfördes. Resultat gav med befintlig utrustning att maskineffektiviteten ökade från 54,3% till 79,8%. Slutsatsen av fallstudien blev att företaget med ett standardiserat arbetssätt kan minska linans produktionsledtid med 37,8% och därmed öka sin konkurrenskraft. Vidare rekommenderas företaget att fortsätta implementera lean-verktyg samt investera i operatörernas arbetsmiljö.

Abstract [en]

Small and medium-sized enterprises (SMEs) are vital to the European economy but competition is increasing, and lead time is playing an increasingly important role. Customers are willing to purchase a company's products if price, quality, and delivery reliability are competitive. Lean principles and various quality tools have emerged to meet these customer demands, making the study of how SMEs can implement concrete improvements in their operations through different improvement tools highly relevant.

The purpose of this report has been to reduce the production lead time for a manufacturing workshop's production line. The report will present how a more efficient flow can be achieved, including the creation of an improvement group in collaboration with employees at the case company, thereby implementing a standardized working method.

Initially, a mapping of the current state was conducted using value stream analyses, observations, time studies, and interviews. The results showed that the production flow suffers from extensive inefficiencies, primarily in the form of waiting times and a lack of smooth flow within the production line. Theoretical calculations confirmed that the line could achieve its production target even at maximum cycle times, meaning that the line itself was not considered a limiting factor.

To standardize the working method a work description was developed together with the improvement group, and two full-scale tests were conducted. The results, using existing equipment, showed an increase in machine efficiency from 54.3% to 79.8%. The conclusion of the case study was that the company through a standardized working method could reduce the production lead time of the line by 37.8%, thereby increasing its competitiveness. Furthermore, the company is recommended to continue implementing lean tools and invest in improving the operators’ working environment

Place, publisher, year, edition, pages
2025. , p. 62
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:kau:diva-106472OAI: oai:DiVA.org:kau-106472DiVA, id: diva2:1987420
Subject / course
Mechanical Engineering
Educational program
Study Programme in Mechanical Engineering
Supervisors
Examiners
Available from: 2025-08-06 Created: 2025-08-06 Last updated: 2026-02-12Bibliographically approved

Open Access in DiVA

fulltext(1863 kB)33 downloads
File information
File name FULLTEXT01.pdfFile size 1863 kBChecksum SHA-512
c49280636d357b493e34f44e169f2ba7d0e14dc00fcc00b6179e9f5e6627944dc88168d6369ec767c0989b5c7564c2a12492677fa83b596f9ad93284baaeb046
Type fulltextMimetype application/pdf

Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 34 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 124 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf