Effektivisering av produktionsflöde för att minska ledtiden: En fallstudie på en tillverkande verkstad för identifiering avförbättringsområden av en halvautomatiserad produktionslina
2025 (Swedish)Independent thesis Basic level (degree of Bachelor), 15 credits / 22,5 HE credits
Student thesisAlternative title
Optimization of the production flow to reduce lead time : A case study at a manufacturing workshop factory to identify areas ofimprovement for a semi-automatic production line (English)
Abstract [en]
Small and medium-sized enterprises (SMEs) are vital to the European economy butcompetition is increasing, and lead time is playing an increasingly important role. Customers are willing to purchase a company's products if price, quality, and delivery reliability are competitive. Lean principles and various quality tools have emerged to meet these customer demands, making the study of how SMEs can implement concrete improvements in their operations through different improvement tools highly relevant. The purpose of this report has been to reduce the production lead time for a manufacturingworkshop's production line. The report will present how a more efficient flow can be achieved, including the creation of an improvement group in collaboration with employees at the case company, thereby implementing a standardized working method. Initially, a mapping of the current state was conducted using value stream analyses, observations, time studies and interviews. The results showed that the production flow suffers from extensive inefficiencies, primarily in the form of waiting times and a lack of smooth flow within the production line. Theoretical calculations confirmed that the line could achieve its production target even at maximum cycle times, meaning that the line itself was not considered a limiting factor. To standardize the working method a work description was developed together with the improvement group, and two full-scale tests were conducted. The results, using existing equipment, showed an increase in machine efficiency from 54.3% to 79.8%. The conclusion of the case study was that the company through a standardized working method could reduce the production lead time of the line by 37.8%, thereby increasing its competitiveness. Furthermore, the company is recommended to continue implementing lean tools and investin improving the operators’ working environment.
Place, publisher, year, edition, pages
2025. , p. 62
Keywords [sv]
Lean manufacturing, ledtidsminskning, produktionslina, flaskhals
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:kau:diva-106469OAI: oai:DiVA.org:kau-106469DiVA, id: diva2:1987320
Subject / course
Mechanical Engineering
Educational program
Study Programme in Mechanical Engineering
Supervisors
Examiners
2025-08-062025-08-052026-02-12Bibliographically approved