Tillämpning av OEE inom asfalt- och bergproduktion: En studie om möjlig tillämpning av OEE inom Skanskas asfalt- och bergverksamhet
Karlstad University, Faculty of Technology and Science, Department of Energy, Environmental and Building Technology.
2025 (Swedish)Independent thesis Basic level (university diploma), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Application of OEE in Asphalt and Rock Materials Production : A study on the potential application of OEE within Skanska’s rock materials and asphalt operations (English)
Abstract [sv]

Detta examensarbete undersöker hur nyckeltalet OEE (Overall Equipment Effectiveness) kan tillämpas inom Skanskas asfalt- och bergverksamhet, med målet att analysera möjligheter och begränsningar i användningen av OEE för att mäta och jämföra produktionseffektivitet. Studien omfattar tre delar av verksamheten: bergmaterialproduktion, asfalttillverkning och asfaltentreprenad.

Arbetet inleds med en litteraturstudie där OEE:s ursprung, struktur och tidigare tillämpningar inom industrin redovisas. Därefter följer en metoddel där insamling och analys av produktionsdata kombineras med intervjuer med produktionspersonal inom Skanska. Samt via en granskning av ett avslutat asfaltentreprenadprojekt utvärderas tillgången på data samt hur parametrarna tillgänglighet, prestanda och kvalitet kan beräknas.

Resultaten visar att OEE är direkt tillämpbart inom krossverksamhet där data loggas kontinuerligt och maskinerna är tydligt avgränsbara. För asfalttillverkning krävs däremot alternativa angreppssätt, då produktionen präglas av variation i drift och fokus snarare ligger på energianvändning än på de faktorer som traditionellt utgör grunden för OEE. Inom asfaltentreprenad är tillämpningen möjlig, men förutsätter noggrann tidsloggning och kvalitetsuppföljning kopplad till produktionstidpunkter.

Slutsatsen är att OEE kan utgöra ett relevant och användbart nyckeltal inom Skanskas berg- och asfaltverksamhets tre delar: bergmaterialproduktion, asfalttillverkning och asfaltentreprenad. Inom asfalttillverkningen krävs dock anpassningar eller kompletterande nyckeltal för att möjliggöra en meningsfull uppföljning av effektivitet.

Abstract [en]

This thesis investigates how the key performance indicator OEE (Overall Equipment Effectiveness) can be applied within Skanska’s asphalt and rock materials operations, with the aim of analyzing the possibilities and limitations of using OEE to measure and compare production efficiency. The study covers three areas of the operations: rock materials production, asphalt manufacturing, and asphalt paving.

The work begins with a literature review, presenting the origins, structure, and previous applications of OEE in industrial contexts. This is followed by a methodology section, where the collection and analysis of production data are combined with interviews conducted with Skanska production personnel. A completed asphalt paving project was reviewed to evaluate data availability and how the OEE parameters — availability, performance, and quality — can be calculated.

The results show that OEE is directly applicable in crushing operations where data is continuously logged and the machinery is well-defined. For asphalt manufacturing, however, alternative approaches are required due to operational variability and a focus on energy consumption rather than on the factors traditionally forming the basis of OEE. In asphalt paving, the application is feasible but relies on detailed time logging and quality tracking linked to the timing of production.

The conclusion is that OEE can serve as a relevant and useful key performance indicator across the three segments of Skanska’s rock and asphalt operations: rock materials production, asphalt manufacturing, and asphalt paving. However, in asphalt manufacturing, adaptations or complementary indicators are necessary to enable meaningful efficiency monitoring.

Place, publisher, year, edition, pages
2025. , p. 43
Keywords [en]
Overall Equipment Effectiveness, OEE, Aggregate Production, Asphalt Production, Asphalt Contracting, Production Analysis, Efficiency, Industry 4.0
Keywords [sv]
Overall Equipment Effectiveness, OEE, Bergmaterialproduktion, Asfaltproduktion, Asfaltentreprenad, Produktionsanalys, Effektivitet, Industri 4.0
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kau:diva-106230OAI: oai:DiVA.org:kau-106230DiVA, id: diva2:1982263
External cooperation
Skanska Industrial Solutions
Subject / course
Construction Engineering
Educational program
Study Programme in Building and Construction Engineering
Supervisors
Examiners
Available from: 2025-08-06 Created: 2025-07-07 Last updated: 2026-02-12Bibliographically approved

Open Access in DiVA

fulltext(703 kB)39 downloads
File information
File name FULLTEXT01.pdfFile size 703 kBChecksum SHA-512
d57b6a0fc5ce7ae14cca86d204073baad39644da636e82eee44df595229c6f3c15060606fabc8d2c81df35dae6367480ddbe28b59f9e895234ab2653dbbdbe31
Type fulltextMimetype application/pdf

By organisation
Department of Energy, Environmental and Building Technology
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 40 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 127 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf