Generating Robust Train Paths with Deep Reinforcement Learning
2024 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE credits
Student thesisAlternative title
Generating Robust Train Paths with Deep Reinforcement Learning (English)
Abstract [en]
The search for methods generating robust rail path in the timetable has been a focus area in academic research and anticipates potential use in industry. It is a foremost requirement to generate train paths in timetable which are robust inherently and are not affected by minordelays. During the tactical planning stages, it is difficult to predict the future delays in order to incorporate required supplement times – which are the additional times added to provide a buffer when a delay is experienced in operation. In practical, creating a timetable is stilla manual process with minor usage of microscopic level tools for eliminating conflicts. In research there are several many optimization techniques proposed and tested to generate robust train paths and have an optimized overall timetable.
In recent years the implementation of reinforcement learning (RL) techniques to schedule or reschedule trains in a timetable has increased due to its ability of finding feasible results by heuristics. This opens a fascinating area of research to test and evaluate the performance of RLmodels and pave a path towards implementation in real world scenarios.
In this thesis, a deep reinforcement learning model is developed to test and evaluate the performance of different deep reinforcement learning (DRL) agents. Initially, a reinforcement learning environment is developed based on the railway timetabling problem. The selectionof parameters, constraints and function provides a deeper insight in the significance of these elements in the final performance of the agent. In this environment, two DRL agents, Soft Actor Critic (SAC) and Trust Region Policy Optimization (TRPO) are trained under severalconstraint conditions and the performance is evaluated. The better performing agent is then tested in the environment to find feasible and optimal train paths. The evaluation is performed under varying conditions of delay and disturbances.
Two experiments are conducted in this thesis based on a case study area, which is part of Swedish Rail Network from Sala (Sl) to Västerås Centralstation (Vc). The results from the evaluation based on the simulation of agent exploiting the learned policy in environment show that the method can generate feasible train paths in a timetable under delay conditions.
Place, publisher, year, edition, pages
2024.
Series
TRITA-ABE-MBT ; 24712
Keywords [en]
Railways, Reinforcement Learning, Timetable Optimization, Train Path Generation, Robust Timetabling
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-353238OAI: oai:DiVA.org:kth-353238DiVA, id: diva2:1897590
Supervisors
Examiners
2024-09-132024-09-13