Abstract [en]
Efficient management of the production process and logistics is crucial for the success of many companies, especially for young companies such as Husmuttern AB, which is in an early establishment phase in Södermanland County, Eskilstuna Municipality. To ensure competitiveness and sustainability, it is important that the company optimizes its resources and minimizes the time spent in the production process. This study focuses on deepening the understanding of the production process of modular houses at Husmuttern AB by analyzing and investigating the current routines and methods for material ordering and material handling. The report aims to answer the following questions:
- How can procedures and methods for material ordering in the production of ceilings, walls and floors be standardized?
- How can the foundation of an ordering system for a manufacturing company be developed
A case study has been conducted by the authors at the company Husmuttern AB, where empirical data was collected through business observations and semi-structured interviews. Both qualitative and quantitative approaches were applied in the context of the theoretical framework.
The empirical data was ranked according to Toyota's mindset (The Toyota Way) and World Class Manufacturing (WCM) on the latest production system in the work process.
The study resulted in the compilation of an Excel document for the project regarding material supply for the entire production system for modular house concepts. The document includes several sheets such as the MAIN MENU, BOM Material, Re-order Point, Safety Stock and Detailed Article Withdrawals, as well as fourteen detailed product sheets for each product included in the house concept.
In this study, it has been identified that the current problems in the production system with the material supply are due to the manual entry of values and the matching of part descriptions between the company and the suppliers, especially about the existing CAD drawings. The data analysis based on material order costs resulted in a variation due to order size and frequency where large orders appeared to be reasonably cost-effective.
Place, publisher, year, edition, pages
2024. , p. 48
Keywords [en]
Just in time, WCM
Keywords [sv]
Lean produktion, Materialhantering, Materialtillförsel
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:mdh:diva-68366OAI: oai:DiVA.org:mdh-68366DiVA, id: diva2:1895824
External cooperation
Husmuttern AB
Subject / course
Mechanical Engineering
Supervisors