Digitala Vetenskapliga Arkivet

Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimering av medieflöden med AI-teknik: Effektiv installationsplanering för sjukhusbyggnader i ett tidigt projekteringsskede
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
Mälardalen University, School of Business, Society and Engineering.
2024 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Purpose: This study aims to analyse how the construction industry can work towards a digitalized workflow by implementing artificial intelligence (AI) in the pre-construction phase. The construction industry is far behind other industries in progress and must keep up to stay relevant and competitive. Furthermore, the study intends to investigate the challenges and added value that arise from the use of AI in the pre-construction phase of heating, ventilation, and air conditioning- systems (HVAC-systems). Additionally, the study seeks to analyse how AI can address time constraints and identify solutions that promote a more efficient workflow. The main purpose of this study is to utilize an AI tool to showcase its potential capabilities. Method: This work is based on two different methodologies, a literature study, and a case study. The literature study has been conducted to investigate the current state and future expectations within AI, as well as how the implementation can streamline the pre-construction phase. The case study is based on a study object as well as an AI tool to analyse the object. Interviews are also included in the case study to add a deeper discussion. Results: The results present a variety of different aspects along with associated challenges regarding the possible use of an AI application in an early pre-construction phase. Two main dimensions have been distinguished, efficiency and time. Regarding efficiency, theoretical value is demonstrated through a literary study. However, according to the case study, these benefits are not currently present due to an early stage of development. Based on the interviews, an indication of potential with further progress is shown. Furthermore, the aspect of time is a significant advantage that substantiates the use. A challenge arises from the fact that a reorganization also entails a significant investment of time, which complicates the decision. Based on the interviews, this investment is decisive regarding the decision. Conclusions: In accordance with identified challenges and values, can a summarized conclusion be reached. In the application´s current state, an implementation will not be beneficial because of complicated usability and inaccuracy regarding the results. However, it has great potential and should be used as inspiration for future projects.

Place, publisher, year, edition, pages
2024. , p. 55
Keywords [sv]
Artificiell intelligens, AI-applikation, medieflöden, projektering, implementering, mervärde, effektivitet, tidsreducering
National Category
Construction Management Building Technologies Other Civil Engineering Other Engineering and Technologies
Identifiers
URN: urn:nbn:se:mdh:diva-68119OAI: oai:DiVA.org:mdh-68119DiVA, id: diva2:1886201
External cooperation
Kadesjös
Subject / course
Building Engineering
Supervisors
Examiners
Available from: 2024-08-01 Created: 2024-07-30 Last updated: 2026-03-12Bibliographically approved

Open Access in DiVA

fulltext(1782 kB)208 downloads
File information
File name FULLTEXT01.pdfFile size 1782 kBChecksum SHA-512
5a264a93e141667c01dcf6cfcf3b5cca4288f48641f560f41e8b2dc2312519e7f111c1d359314b75137ab2f6cb50b1373006308085a4969d3cd770ae3185a197
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Hallin, IdaLennqvist, EmmaEriksson, Isac
By organisation
School of Business, Society and Engineering
Construction ManagementBuilding TechnologiesOther Civil EngineeringOther Engineering and Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 213 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 812 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf