Integration av BESS för förstärkt elnätsstabilitet på Ekerö
KTH, School of Industrial Engineering and Management (ITM), Production engineering.
2024 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Integration of BESS for enhanced electricity grid stability in Ekerö (English)
Abstract [sv]

Denna rapport undersöker implementeringen av batterienergilagringssystem (BESS) som en strategisk åtgärd för att hantera de återkommande instabiliteterna i elnätet i Ekerö kommun. Den lokala elkraftsinfrastrukturen drabbas ofta av frekventa och långvariga avbrott, huvudsakligen på grund av sitt beroende av sårbara luftledningar. Integrationen av BESS erbjuder en dubbel fördel: förbättrad nätstabilitet och tillhandahållande av nödvändiga stödtjänster under perioder med hög efterfrågan.

Studien inleds med en analys av de nuvarande förhållandena i Ekerös elnät, där de ekonomiska och operativa utmaningarna med den befintliga infrastrukturen belyses. Luftledningarna är särskilt utsatta för miljöpåfrestningar, vilket resulterar i betydande tjänsteavbrott som påverkar både hushåll och kommersiella konsumenter. De ekonomiska konsekvenserna är betydligt viktiga, inte bara på grund av de direkta kostnaderna för reparationer, utan också på grund av de ersättningar som krävs enligt regulatoriska standarder vid tjänstefel.

Som en lösning på dessa utmaningar föreslås en strategisk placering av BESS-enheter i kommunen. Dessa system kan lagra överskottsenergi som genereras under perioder med låg efterfrågan, såsom nattetid eller under perioder med låg belastning, och frigöra den under perioder med hög efterfrågan eller när nätet inte kan möta belastningskraven. Denna kapacitet bidrar inte bara till reservkraft och stabilisering av elnätet, utan säkerställer även en mer effektiv användning av genererad energi, vilket minskar spill och potentiellt sänker elkostnaderna för kommunen.

För att besvara frågeställningarna kring den optimala kapaciteten och placeringen av BESS har HOMER Pro använts. HOMER Pro är en mjukvara för optimering av mikronät. Med HOMER Pro har olika scenarier simulerats för att hitta den mest effektiva lösningen baserat på Ekerös specifika energibehov och nätförhållanden. Simuleringarna har resulterat i en rekommendation om att implementera en total kapacitet av cirka 52 MWh batterilagring vid samtliga nätstationer för att tillgodose kommunens energibehov under avbrott och hög belastning.

Vidare beskriver rapporten de tekniska specifikationerna och de operativa mekanismerna för BESS, inklusive de batterityper som övervägs (t.ex. litiumjon, bly-syra), deras förväntade livslängd, kapacitet och effektivitet. Den undersöker också potentiella platser för installation, bedömer deras inverkan på den övergripande nätstabiliteten och de logistiska övervägandena vid distribution och underhåll av dessa system.

Slutligen förespråkar rapporten antagandet av BESS i Ekerö som ett kritiskt steg mot en mer motståndskraftig och ekonomiskt hållbar energiinfrastruktur. Genom att minska effekterna av strömavbrott och optimera användningen av elektrisk energi kan BESS avsevärt förbättra servicenivån för Ekerös invånare och företag, och sätta en standard för andra kommuner med liknande utmaningar.

Abstract [en]

This report investigates the implementation of Battery Energy Storage Systems (BESS) as a strategic measure to address the recurring electrical grid instabilities in the municipality of Ekerö. The local power infrastructure frequently experiences outages due to its reliance on vulnerable overhead power lines. The integration of BESS offers dual benefits: improved grid stability and the provision of essential support services during periods of high demand. The study begins with an analysis of the current conditions of the electrical grid of Ekerö, highlighting the economic and operational challenges posed by the existing infrastructure. Overhead lines are particularly susceptible to weather conditions, which lead to significant service interruptions that impact both residential and commercial consumers. The economic implications are substantial, not only due to direct repair costs but also due to compensations required by regulatory standards for service failures.

In response to these challenges, the report proposes the strategic placement of BESS units throughout the municipality. These systems can store excess energy generated during periods of low demand, such as nighttime or off-peak hours, and release it during periods of high demand or when the grid cannot meet the load requirements. This capability not only stabilizes the grid but also ensures more efficient use of generated power, reducing wastage and potentially lowering electricity costs for the municipality.

To address questions regarding the optimal capacity and placement of BESS, the report utilizes HOMER Pro software for microgrid optimization. Various scenarios were simulated using HOMER Pro to determine the most effective solution based on Ekerö’s specific energy needs and grid conditions. The simulations resulted in a recommendation to implement a total capacity of approximately 52 MWh of battery storage across all substations to meet the municipality’s energy needs during outages and periods of high demand.

Furthermore, the report details the technical specifications and operational mechanisms of BESS, including the types of batteries considered (e.g., lithium-ion, lead-acid), their expected lifespan, capacity, and efficiency levels. It also examines potential installation sites, assessing their impact on overall grid stability and the logistical considerations involved in deploying and maintaining these systems.

In conclusion, the report advocates for the adoption of BESS in Ekerö as a critical step towards a more resilient and economically sustainable energy framework. By mitigating the impact of power outages and optimizing the use of electrical energy, BESS can significantly enhance the quality of service provided to Ekerö’s residents and businesses, setting a precedent for other municipalities facing similar challenges.

Place, publisher, year, edition, pages
2024. , p. 42
Series
TRITA-ITM-EX ; 2024:440
Keywords [en]
BESS, Battery Energy Storage system Power grid support, Energy supply, Power outage Ekerö
Keywords [sv]
BESS, Bateri energilagringssystem, Elnätsstöd, Energiförsörjning, Strömavbrott Ekerö
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-349713OAI: oai:DiVA.org:kth-349713DiVA, id: diva2:1881190
Supervisors
Examiners
Available from: 2024-07-02 Created: 2024-07-02

Open Access in DiVA

fulltext(25549 kB)525 downloads
File information
File name FULLTEXT01.pdfFile size 25549 kBChecksum SHA-512
9a90081eb66e0ef2d769a9160ee1661e3d17d0fb4f2ea2ffb2a961ab9dfa8f3067f9171f42d04a661694229393d41b293e0d0c4ab294a142762bcccf9d342195
Type fulltextMimetype application/pdf

By organisation
Production engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 526 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 888 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf