Digitala Vetenskapliga Arkivet

Driftstörningar
Det förekommer återkommande driftstörningar på några av sök-portalerna på grund av hög belastning. Vi arbetar på att lösa problemet, ni kan tillfälligt mötas av ett felmeddelande.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Simulation-based capacity analysis of a battery foil production facility – A study at Gränges in Finspång
Linköpings universitet, Institutionen för teknik och naturvetenskap.
Linköpings universitet, Institutionen för teknik och naturvetenskap.
2026 (Engelska)Självständigt arbete på avancerad nivå (magisterexamen), 20 poäng / 30 hpStudentuppsats (Examensarbete)Alternativ titel
Simuleringsbaserad kapacitetsanalys av en batterifolieanläggning - En studie vid Gränges i Finspång (Svenska)
Abstract [en]

The green electrification boom within the automotive industry has led to a significant increase in demand for materials used in battery manufacturing, where aluminum foil is a key component in lithium-ion batteries. Gränges is a Swedish industrial company operating globally within the aluminum industry, producing rolled aluminum for various industrial applications, primarily within the automotive sector. To meet the growing demand, the company has built a new production facility in Finspång focused on the production of battery cathode foil. The purpose of this study has been to investigate how the production capacity of the battery foil plant is affected by different investment alternatives and experimental factors. The objective has been to provide decision support for future investments during the ongoing ramp-up phase, where processes and workflows are not yet fully stabilized. To analyze the system, a simulation study was conducted in which the current production system. Simulation was chosen as the method due to the system’s complexity, consisting of multiple interconnected subsystems, and the need to analyze future scenarios involving changes in machinery and process parameters. The simulation model was initially validated against the current production by using existing parameters and shift schedules to ensure that it produced realistic material flows and throughput. The model was then used to analyze the system under stable operating conditions after ramp-up. These scenarios were evaluated across different levels of three experimental factors: proportion of half coils, mother coil change time, and yield. The results show that, in the base scenario, the plant can produce approximately 217 tons of approved material per week out of a total of 281 tons produced, assuming a mother coil change time of 1 hour, a yield of 77%, and a half coil proportion of 5%. This aligns well with the company’s internal estimates. Several investment scenarios were also analyzed, where additional cold rolling mills and slitting lines were introduced into the system. The results showed that the system could produce approximately 249 tons of approved material per week out of a total of 323 tons produced. The conducted effect analysis revealed that mother coil change time and the proportion of half coils had the greatest impact on overall system capacity and throughput, while yield primarily affected the amount of approved material rather than total production volume. This implies that improvements in yield increase the volume of sellable products without increasing system capacity in terms of tons per week. The study also shows that investments in new machinery do not automatically lead to increased production capacity. In some scenarios, investments initially resulted in lower capacity for battery foil production compared to the base system. This can partly be explained by the current use of a simplified model of cold rolling mill 2712 from another part of the facility, meaning that battery foil production currently draws capacity from existing production flows. By investing in dedicated resources for battery foil production, the dependency on mill 2712 can be reduced, thereby freeing up capacity for other production flows at the site and potentially improving the overall production capacity of the entire facility. The results also indicate that system balancing, such as adding buffer capacity and improving the distribution of workload between machines, is crucial for investments to achieve the desired effect. In summary, the study shows that investments in additional machinery, combined with improved system balancing, can increase the capacity of the battery foil plant while reducing dependency on existing production flows. The results also highlight that mother coil change time and the proportion of half coils are the most influential factors affecting system capacity and should therefore be carefully considered in future investment decisions. Yield mainly affects the amount of approved material and not the overall throughput.

Ort, förlag, år, upplaga, sidor
2026. , s. 94
Nyckelord [en]
Simulation, Arena Simulation Software, production ramp-up, aluminium, Gränges, battery foil, battery cathode foil, capacity analysis, discrete event simulation, production capacity
Nyckelord [sv]
Simulering, Arena, ramp-up, aluminium, Gränges, batterifolie, batterikatodfolie, kapacitetsanalys, diskret händelsesimulering, produktionskapacitet
Nationell ämneskategori
Transportteknik och logistik
Identifikatorer
URN: urn:nbn:se:liu:diva-225835ISRN: LiU-ITN-TEK-A--26/012--SEOAI: oai:DiVA.org:liu-225835DiVA, id: diva2:2081049
Externt samarbete
Gränges Finspång AB, Finspång
Ämne / kurs
Industriell Ekonomi
Handledare
Examinatorer
Tillgänglig från: 2026-06-29 Skapad: 2026-06-29 Senast uppdaterad: 2026-06-29Bibliografiskt granskad

Open Access i DiVA

fulltext(2065 kB)42 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 2065 kBChecksumma SHA-512
ad15d4502789c13a92c30d49487537c9716c465a35e59be3cda0510f628b18d8b3b7f4ee64bac425065bfe666a4c2ccb00d35c30cf1c98ad69479d3edd0f46c1
Typ fulltextMimetyp application/pdf

Sök vidare i DiVA

Av författaren/redaktören
Joelsson, SimonMarmén, Amanda
Av organisationen
Institutionen för teknik och naturvetenskap
Transportteknik och logistik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 392 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf