Digitala Vetenskapliga Arkivet

Driftstörningar
Det förekommer återkommande driftstörningar på några av sök-portalerna på grund av hög belastning. Vi arbetar på att lösa problemet, ni kan tillfälligt mötas av ett felmeddelande.
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Deliverable 32.2: Capacity impacts of innovations
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.ORCID-id: 0000-0001-6880-8549
Faculty of Civil Engineering and Geosciences, Delft University of Technology, Delft, The Netherlands.
Swedish Transport Administration, Sweden.
Linköpings universitet, Institutionen för teknik och naturvetenskap, Kommunikations- och transportsystem. Linköpings universitet, Tekniska fakulteten.
Visa övriga samt affilieringar
2017 (Engelska)Rapport (Övrigt vetenskapligt)
Abstract [en]

Deliverable D32.2 “Capacity impacts of innovations” summarizes the results of the Capacity 4 Rail work package WP3.2 “Simulation and models to evaluate enhanced capacity (infrastructure and operation)”. Capacity in the railway system can be divided in strategic level (planning of infrastructure), tactical level (timetabling) and operational level (dispatching). Closely related to the operational planning are Driver Advisory Systems (DAS), which in the future may be extended towards fully automatized driving.

At strategic level an analysis have been made about line capacity and train capacity for future rail freight corridors. The analysis shows how to increase capacity for future freight trains 2030/2050, by extending the train capacity well as the line capacity and the combination of train and line capacity for futures scenarios.

In the future, the processes for tactical and operational planning are merging, meaning that the timetable is no longer a static, or annually updated, product, but a working document that is improved successively, until handed over to operational management. Also in the operational management, we believe that control by planning is a good strategy. Processes for capacity and timetable planning, as well as timetable and traffic simulation systems are under development. The amount of available data is increasing.

The main research results of Capaciyt 4Rail SP 3.2 have been:

1. A model framework for modelling and planning of demand and supply of capacity at various levels with micro simulation, data analysis and optimisation. By combining these methods especially tactical and operational planning and control can be improved, and hence, enabling more trains and/or increased on-time performance.

2. A statistical model (LiU model) to forecast delay propagation. The model relies on the theory of Bayesian networks, and can be used both for planning and informing.

3. A demonstrator, CAIN, an extension to the KADR system for timetable and operational traffic developed by Oltis group Czech. The CAIN tool is connected to the LiU model and relies on data from Railsys (micro level infrastructure, complete tracklayout modelled) and Trafikverket database of disturbances and delays Lupp. The demonstrator has been set-up for Malmö – Hallsberg, a part of the Scandinavian Mediterranean corridor TEN-T network. It has given us new knowledge about interaction between IM timetable system and optimisation/data analysis model to predict timetable robustness and punctuality in the network due to changes in the timetable.

4. A separate analysis of space–time points in the timetable critical for robustness. The study of critical points in this project has given knowledge about how to use the method when data is known at micro level, represented by RailSys. The improved robustness is also set in relation to other key performance indicators.

Ort, förlag, år, upplaga, sidor
2017. , s. 225
Nationell ämneskategori
Transportteknik och logistik
Identifikatorer
URN: urn:nbn:se:liu:diva-160520OAI: oai:DiVA.org:liu-160520DiVA, id: diva2:1354451
Forskningsfinansiär
EU, FP7, Sjunde ramprogrammet, SCP3-GA-2013-605650Tillgänglig från: 2019-09-25 Skapad: 2019-09-25 Senast uppdaterad: 2019-09-25Bibliografiskt granskad

Open Access i DiVA

fulltext(11284 kB)811 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 11284 kBChecksumma SHA-512
0204dd48955cd2747d138fdc5526761068d76474e25b0c7f7b3194b1d44a2d56372993298af7ef294b802f69c9503867009a0012004ddfe925d2b320e8c406bd
Typ fulltextMimetyp application/pdf

Övriga länkar

Related document

Sök vidare i DiVA

Av författaren/redaktören
Peterson, AndersKecman, PavleRingdahl, Rasmus
Av organisationen
Kommunikations- och transportsystemTekniska fakulteten
Transportteknik och logistik

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 812 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 295 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf