Digitala Vetenskapliga Arkivet

Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Procurement of Railway Maintenance: Collaboration for Innovation
Real Estate and Construction Management, Kungliga Tekniska Högskolan (KTH), Brinellvägen 8, 114 28 Stockholm, Sweden.
Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle, Industriell Ekonomi.
Luleå tekniska universitet, Institutionen för ekonomi, teknik och samhälle, Industriell Ekonomi.ORCID-id: 0000-0002-1746-2637
2018 (Engelska)Ingår i: Thirty-Fourth Annual Conference 2018 September 3-5 Belfast: Working Papers, Association of Researchers in Construction Management (ARCOM), 2018, s. 184-193Konferensbidrag, Publicerat paper (Refereegranskat)
Abstract [en]

Railway maintenance is highly important for a sustainable transport system. A popular choice in Europe is to outsource the railway maintenance obligation through a public procurement process. Public procurement of railway maintenance has gained relatively little attention in research despite that the competitive tendering approach implies several challenges, especially related to collaboration and innovation. Hence, the aim of this study is to explore public procurement of railway maintenance, with a particular focus on how various factors support or hinder collaboration and innovation. A multiple case study approach is used, including interviews with client and contractor representatives and a multidimensional framework on partnering as supply chain integration guides the analysis. Tentative findings indicate that there is potential in strengthening the supply chain integration in the studied context. Findings provide theoretical contribution to supply chain integration, for example by pinpointing the importance of addressing informal relationships at the individual level in maintenance contracts. Furthermore, a practical implication for managing transport infrastructure maintenance contracts is the importance of addressing collaboration depth by allocating sufficient human resources to the client organisation.

Ort, förlag, år, upplaga, sidor
Association of Researchers in Construction Management (ARCOM), 2018. s. 184-193
Nyckelord [en]
collaboration, supply chain integration, railway maintenance
Nationell ämneskategori
Tillförlitlighets- och kvalitetsteknik Företagsekonomi
Forskningsämne
Kvalitetsteknik; Entreprenörskap och innovation
Identifikatorer
URN: urn:nbn:se:ltu:diva-75640OAI: oai:DiVA.org:ltu-75640DiVA, id: diva2:1344629
Konferens
34th Annual ARCOM Conference, 3-5 September, 2018, Belfast, Northern Ireland
Tillgänglig från: 2019-08-21 Skapad: 2019-08-21 Senast uppdaterad: 2025-10-22Bibliografiskt granskad
Ingår i avhandling
1. Exploring Public Procurement of Swedish Railway Infrastructure Maintenance
Öppna denna publikation i ny flik eller fönster >>Exploring Public Procurement of Swedish Railway Infrastructure Maintenance
2019 (Engelska)Licentiatavhandling, sammanläggning (Övrigt vetenskapligt)
Abstract [en]

In 2002, Sweden started to outsource its railway infrastructure maintenance. Through gradual exposure (i.e. outsourcing one contract area at a time), the Swedish Transport Administration has developed its competence of being a client towards its contractors. The last contract was outsourced in 2014. In the last decade, the development of governance techniques and maintenance cost has not matched the increase in traffic. Due to an increased awareness in environmentally friendlier transportation, traffic is only expected to increase further in the coming years. Governance techniques and maintenance cost ultimately depends on the client-contractor relationship through public procurement. Hence, there is a need to understand public procurement of railway infrastructure maintenance. Therefore, the purpose of this thesis is to contribute to the knowledge of public procurement of railway infrastructure maintenance. Three separate studies were conducted. Study 1 was a literature review to explore and determine the state-of-the-art for the field of public procurement of railway maintenance. Study 2 was a linear regression analysis to examine the relationship between contract design and the output of maintenance in Sweden. Study 3 was an interview study in Sweden that explored what factors that supports or hinders collaboration in railway maintenance.

The main results of these studies are that asset knowledge is important for both the client and the contractor. Through reliable asset knowledge, incentives and contracts can be designed to support governance and collaboration. Today, railway infrastructure maintenance is dominated by informal relationships that lack the support of formal partnering activities. When an informal relationship is supported by a formal structure it provides a basis for innovation. This formal structure should be centralized around gaining and sharing asset knowledge. By establishing such a system to increase the asset knowledge and supporting collaboration, public organizations of maintenance can provide a basis for the improvement of maintenance.

Ort, förlag, år, upplaga, sidor
Luleå: Luleå University of Technology, 2019
Serie
Licentiate thesis / Luleå University of Technology, ISSN 1402-1757
Nyckelord
Public Procurement, Railway Maintenance, Supply Chain Management, Contract Design
Nationell ämneskategori
Tillförlitlighets- och kvalitetsteknik
Forskningsämne
Kvalitetsteknik
Identifikatorer
urn:nbn:se:ltu:diva-75657 (URN)978-91-7790-425-0 (ISBN)978-91-7790-426-7 (ISBN)
Presentation
2019-10-17, A109, Luleå, 09:30 (Svenska)
Opponent
Handledare
Forskningsfinansiär
Trafikverket, 47314Forskningsrådet Formas, 47314
Tillgänglig från: 2019-08-23 Skapad: 2019-08-23 Senast uppdaterad: 2025-10-22Bibliografiskt granskad

Open Access i DiVA

fulltext(240 kB)635 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 240 kBChecksumma SHA-512
a81709f417e2346d35094ef5d62d4afd1d55d4659616210227d057a1c677930e5b1d102d619ba378cdc4f2f08baed0c7037f4c6e4479f1434c6b89cd8c14dbc8
Typ fulltextMimetyp application/pdf

Övriga länkar

http://www.arcom.ac.uk/-docs/archive/2018-Working-Papers.pdf

Sök vidare i DiVA

Av författaren/redaktören
Aldenlöv, JensEriksson, Per-Erik
Av organisationen
Industriell Ekonomi
Tillförlitlighets- och kvalitetsteknikFöretagsekonomi

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 637 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 546 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf