An approach to long range production and development planning with application to the Kiruna Mine, Sweden
Luleå tekniska universitet.
1994 (English)Doctoral thesis, comprehensive summary (Other academic)
Abstract [en]

The mining industry is increasingly oriented towards large scale mining and the planning concept of "Just in Time", which means activities starting and ending as late as possible without jeopardising production. The buffers, consisting of production blocks and development ahead of production, are then minimi. This, however, leads to a larger dependency on the quality of the output from the production systems. The Kiruna mine, Sweden, is a large scale mine and has a number of potential ore blocks with a content that varies in quality (Fe, P, K) and in quantity (ore tonnage). Ore production is restricted by operative and block sequencing constraints as well as by production requirements. A computerized planning model, based on operations research (multi period scheduling) has been developed to meet future demands on ore qualities and quantities. The model uses long range objectives, but can satisfy temporary short range demands without jeopardising the long range goals. A sub-optimal plan, made using the model, has been compared with a truly optimal plan. It is shown that, due to the unreliable information concerning the ore, the sub-optimal plan performs as well as the optimal one. The simulation process that was developed for this comparison is also used to estimate the need for production buffer blocks. Another buffer planning model is developed to determine when development work should take place in order to minimize the risk of additional costs, caused by an inability to start production on time. This algorithm considers the uncertainties in activity durations and is based on a Monte Carlo simulation using project networks and estimates the optimum development buffer.

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 1994. , 175 p.
Series
Doctoral thesis / Luleå University of Technologyy… → 31 dec 1996, ISSN 0348-8373 ; 143
National Category
Other Civil Engineering
Research subject
Mining and Rock Engineering
Identifiers
URN: urn:nbn:se:ltu:diva-25790Local ID: b1fd7500-f661-11db-ac79-000ea68e967bOAI: oai:DiVA.org:ltu-25790DiVA: diva2:998947
Note
Godkänd; 1994; 20070429 (ysko)Available from: 2016-09-30 Created: 2016-09-30Bibliographically approved

Open Access in DiVA

fulltext(79574 kB)31 downloads
File information
File name FULLTEXT01.pdfFile size 79574 kBChecksum SHA-512
66064e3878ae1b1469161b7f6d6b674609fc8586a4bb1973d09c7f5bfa28dabccdc9f0142084f39eb686e8bbc0e7bccfe3497cdd5fabc2b5c9b12b16578a5f3c
Type fulltextMimetype application/pdf

Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 31 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 169 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf