Change search
ReferencesLink to record
Permanent link

Direct link
Experimental testing of hold down devices for timber frame shear walls
Luleå University of Technology, Department of Civil, Environmental and Natural Resources Engineering, Structural and Construction Engineering.
2012 (English)Report (Other academic)
Abstract [en]

Källsner and Girhammar [1] have presented a new plastic design method for wood-framed shear walls at ultimate limit state. This method allows the designer to calculate the load-carrying capacity of partially anchored shear walls, where the leading stud is not anchored against uplift. The anchorage system of shear walls is provided by anchor bolts in the bottom rail and hold downs at the leading stud. Anchor bolts provide horizontal shear continuity between the bottom rail and the foundation. Hold downs are directly connecting the vertical leading stud to the foundation. Sometimes hold downs are not provided and only the bottom rail is anchored to the substrate. In this case the bottom row of nails transmits the vertical forces in the sheathing to the bottom rail (instead of the stud) where the anchor bolts will further transmit the forces into the foundation. In this report hold downs have been experimentally studied with respect to the strength and stiffness of the connection. Four different types of hold downs have been tested. The specimen was subjected to tension load applied to the stud. Four tests series are presented. Each series was divided into different sets according to the type of fastener used with the hold down device. The results show that the failure load is higher when hold downs with anchor bolts are used, up to ten times higher than the anchorage that uses only screws or nails. The failure mode vary with the type of hold down and the type of fasteners used. The tests showed three primary failure modes: failure of the stud when a bolt is used as the fastener between hold down device and stud, failure due to pull-out of the screws or nails from the rail and failure due to failure or pull-out of screws or nails from stud. Also, failure of the stud itself occurred in some tests caused by some defect of the timber

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 2012. , 173 p.
Technical report / Luleå University of Technology, ISSN 1402-1536
Keyword [en]
timber shear walls, partially anchored, hold downs, rail-to-stud joint, tie downs, Civil engineering and architecture - Building engineering
Keyword [sv]
Samhällsbyggnadsteknik och arkitektur - Byggnadsteknik
Research subject
Timber Structures
URN: urn:nbn:se:ltu:diva-23918Local ID: 8eca2f2b-b2d0-46f3-8c23-38370c76bd51ISBN: 978-91-7439-386-6OAI: diva2:996968
Godkänd; 2012; 20120116 (giucap)Available from: 2016-09-29 Created: 2016-09-29Bibliographically approved

Open Access in DiVA

fulltext(29055 kB)0 downloads
File information
File name FULLTEXT01.pdfFile size 29055 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Caprolu, Giuseppe
By organisation
Structural and Construction Engineering

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

ReferencesLink to record
Permanent link

Direct link