Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Study of rail breaks: associated risks and maintenance strategies
2006 (English)Report (Other academic)
Abstract [en]

Railways are large infrastructures and are the prime mode of transportation in many countries. As it is closely associated with passenger and cargo transportation, it owns high risk in terms of human lives and cost of assets. New technologies and better safety standards are constantly introduced but still accidents do occur. There will always be some risk associated with derailments and collisions but it can be reduced by elimination of the root causes. These causes necessitate an effective maintenance strategy to govern optimization of inspection frequency and/or improvement in skill and efficiency. A detailed study of the defects which emerge both on the rolling stock and rail infrastructure is essential to frame out the correct maintenance strategy. Detection and rectification of rail defects are major issues for all rail players around the world. Some of the defects include worn out rails, weld problems, internal defects, corrugations and rolling contact fatigue (RCF) initiated problems such as surface cracks, head checks, squats, spalling and shelling. If undetected and/or untreated these defects can lead to rail breaks and derailments. There are challenges to the infrastructure maintenance people to perform effective inspection and cost effective rectification decisions. If these issues are addressed properly, inspection and rectification decisions can reduce potential risk of rail breaks and derailments. In-spite of continuous efforts made by all rail operators around the world to reduce costs, a substantial amount of railway budget is spent on inspection and maintenance of rails. It is understood that the consequential cost due to derailment reduces with increase in inspection, lubrication and grinding costs. The challenge is to reduce the maintenance cost which consists of inspection, lubrication and grinding costs and at the same time prevent a rise in consequential cost due to derailment. Risk evaluation has become an important parameter for the management to decide a better and cost effective solution that could meet the budgetary constraints regarding renewal, replacement and inspection frequency of rails and wheels. Thus, before development of any model or any empirical relationship associated with risk, familiarity with risk management tools is required. This study focuses on building up a basic knowledge required for establishing such a relationship. The aim is to reduce costs and risks related to rail operation by effective decisions related to rail inspection, grinding, lubrications, rectifications and rail replacements. Different types of rail defects and degradation processes have been studied. From the literature survey and studies done by the author, it is interpreted that there is a need for better prediction of rail defects over a period of time based on operating conditions and maintenance strategies. The issues and challenges related to rail maintenance are outlined for further research in this area. The maintenance strategy followed by Banverket is also described.

Place, publisher, year, edition, pages
Luleå: Luleå tekniska universitet, 2006. , 33 p.
Series
Technical report / Luleå University of Technology, ISSN 1402-1536 ; 2006:07
National Category
Other Civil Engineering
Research subject
Operation and Maintenance
Identifiers
URN: urn:nbn:se:ltu:diva-22201Local ID: 1ee3cc30-a72b-11dc-9534-000ea68e967bOAI: oai:DiVA.org:ltu-22201DiVA: diva2:995250
Note
Godkänd; 2006; 20071210 (ysko)Available from: 2016-09-29 Created: 2016-09-29 Last updated: 2017-11-24Bibliographically approved

Open Access in DiVA

fulltext(1089 kB)416 downloads
File information
File name FULLTEXT01.pdfFile size 1089 kBChecksum SHA-512
0d8d50b24e796aac83356bfa48fac2e204bff85c624abea1263791ca5488e60eac38d8ac352feff5a6fe44f632a9cc0f240d956dfb505b1fc0e5ce035fe89c01
Type fulltextMimetype application/pdf

Authority records BETA

Kumar, Saurabh

Search in DiVA

By author/editor
Kumar, Saurabh
Other Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 416 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 102 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf