Prognostisering av produktionskapacitet - En studie på PET-Turbuhaler, AstraZeneca
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2016 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Forecasting capacity of PET-Turbuhaler production at AstraZeneca (English)
Abstract [sv]

En viktig aspekt för att få ett företag att bli så framgångsrikt som möjligt är att ha en träffsäker kapacitetsprognostisering av produktionen. En kapacitetsprognostisering hjälper ett företag att förutse och planera sin produktion för att kunna uppfylla den framtida efterfrågan. Därför är det av stor betydelse att prognostiseringen av kapaciteten är träffsäker. Detta är huvudområdet i denna examensrapport.

Rapportens författare kom under vårterminen 2016 i kontakt med produktionsenheten PET-Turbuhaler på AstraZeneca i Södertälje. De efterfrågade en träffsäker modell för deras kapacitetsprognostisering på lång sikt, 12-24 månader. Examensarbetets syfte har därför sammanställts i en huvudfrågeställning som lyder; Vilket arbetssätt är det bästa för att PET-Turbuhaler ska uppnå en träffsäker produktionskapacitetsprognostisering på 12-24 månader?

För att besvara frågeställningen genomfördes en förstudie, en litteraturstudie samt en intern och en extern benchmarking som alla analyserades och sammanställdes. Förstudien gav en övergripande bild av hur arbetet med den Microsoft Excel-modell som PET-Turbuhaler använder idag fungerar. Dessutom framkom vilka problem som de anställda ser att det finns med den nuvarande modellen. Författarna har även gjort egna analyser av PET-Turbuhalers kapacitetsmodell.

Litteraturstudien som gjordes visar bland annat varför det är en skillnad mellan teoretisk och verklig kapacitet. För att beräkna den verkliga produktionskapaciteten behöver anläggningens schemalagda kapacitetsförluster (t.ex. lunch, möten), kapacitetsbortfall (t.ex. maskinhaveri, ställtid) och ej planerad verksamhet (t.ex. defekter) subtraheras från anläggningens teoretiska kapacitetstillgång, d.v.s. när anläggningen är igång dygnet runt, året om.

Analysen visade att den modell som PET-Turbuhaler använder idag omfattar i stort sett samma parametrar som den modell litteraturen hänvisar till. Examensarbetarna insåg därför att PET-Turbuhalers problem med en bristande kapacitetsprognos på lång sikt inte nödvändigtvis ligger i den modell som används idag utan snarare i hur modellen används. Det har kommit upp till ytan att parametrar inom den nuvarande modellen inte uppdateras kontinuerligt med aktuell indata. Detta gör att gammal produktionsdata som är inaktuell ligger till grund för den kapacitetsprognos som görs på lång sikt.

Frågeställningen kunde besvaras utifrån det underlag som tagits fram i analysen. Det mest intressanta resultatet blev att PET-Turbuhalers kapacitetsprognos på kort sikt inte är lika träffsäker som man tidigare trott. Följden av detta är att ett bra fungerande standardiserat arbete för den korta prognosen behöver utformas för att i framtiden få en träffsäkrare prognos på lång sikt.

Efter diskussioner av resultatet kunde examensarbetarna slutligen komma fram till rekommendationer för hur PET-Turbuhaler bör fortsätta arbeta. Några av rekommendationerna är att utvärdera insamlad data kontinuerligt, ha regelbundna möten mellan produktionstekniker och gruppchefer samt att montera en sensor, som kan registrera output-takten, längst ner i flödet på produktionslinorna.

Abstract [en]

A company needs an accurate capacity plan to become successful. The capacity plan is an important tool for planning and anticipating production which is essential to be able to meet future demands. It is therefore of great importance to get an accurate forecasting of the production capacity, which is the main topic of this report.

During the spring semester 2016, the authors of this report were contacted by the production unit PET-Turbuhaler at AstraZeneca in Södertälje. PET-Turbuhaler requested an accurate model for the long term, 12-24 months, forecasting of their production capacity. From this problem, a research question has been formulated into; Which is the best way for PET-Turbuhaler to work to reach an accurate long term, 12-24 months, production capacity prognosis?

A pre-study, a literature study and an internal and an external benchmarking were conducted in order to answer the research question. The result from these were afterwards compiled and analyzed. The pre-study at PET-Turbuhaler gave an overview of the work with the current Microsoft Excel-model and its associated problems. The pre-study did also consist of the authors’ own analysis of PET-Turbuhalers capacity model.

The literature study was made to investigate how theory advocates the work with capacity forecasting. It showed a difference between theoretical and real capacity. The real capacity is calculated by subtracting the plant’s scheduled and nonscheduled capacity losses (such as time losses for lunch, meetings, set-ups, machine breakdowns and defects from production) from the theoretical capacity. The theoretical capacity of the plant is the capacity when the plant runs 24 hours a day every day of the year.

The analysis showed that the current model PET-Turbuhaler use today consist of more or less the same parameters as the literature suggests. The authors could therefore realize that the current model is not necessarily the main problem at this stage. The biggest problem is rather how the current model is being used by the employees. Parameters within the current model are not continuously updated with right data as PET-Turbuhaler thought. The consequence of this is that the long term forecasting is based on out-of-date data even though new and more accurate data is available.

The research question can be answered based on the analysis. The most interesting result was the insight that the short term forecasting is not as accurate as PET-Turbuhaler believed. This gives, in order to achieve a good long term forecasting, that PET-Turbuhaler must first improve their short term forecasting by establishing a standardized way of working with the model. Only then can the long term forecasting be accurate.

Through discussions regarding the result the authors were able to suggest improvements on how PET-Turbuhaler could work to reach an accurate long term forecast of their production capacity prognosis. The recommendations include continuous evaluation of collected data, regular meetings between production support and production line managers and the benefit of using a sensor, in the end of the production line, to registrate the output rate.

Place, publisher, year, edition, pages
2016. , 47 p.
Series
, Degree Project in Production Engineering, 689
Keyword [en]
Production capacity, capacity, forecasting, capacity model, theoretical capacity, real capacity
Keyword [sv]
Produktionskapacitet, kapacitet, prognostisering, kapacitetsmodell, teoretisk kapacitet, verklig kapacitet
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:kth:diva-192899OAI: oai:DiVA.org:kth-192899DiVA: diva2:972789
Supervisors
Examiners
Available from: 2016-09-22 Created: 2016-09-22 Last updated: 2016-09-22Bibliographically approved

Open Access in DiVA

fulltext(1052 kB)3 downloads
File information
File name FULLTEXT01.pdfFile size 1052 kBChecksum SHA-512
4c303b2a697e31c8e7da9123829c671372197159bd4cc60fa1b67b4ee00d3d1b9746e7141b6b2e20c3c86b9c1d9520c6d48557800a31eb864deb13d1a1fdfd7e
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 3 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 5 hits
ReferencesLink to record
Permanent link

Direct link