Change search
ReferencesLink to record
Permanent link

Direct link
Arbetsplatsbesök -Blev det som det var tänkt?
Örebro University, School of Science and Technology, Örebro University, Sweden.
Örebro University, School of Science and Technology, Örebro University, Sweden.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Workplace visits-Do they correspond to the aim? (English)
Abstract [sv]

Det har nu gått 5 år sedan den nya plan- och bygglagen trädde i kraft, där bland annat det obligatoriska arbetsplatsbesöket infördes. Införandet grundade sig i att myndigheterna tidigare inte hade så bra insyn i byggnationerna runt om i landet. För att öka myndigheternas insyn infördes obligatoriska arbetsplatsbesök. Vid ett arbetsplatsbesök som utförs av en handläggare som representerar byggnadsnämnden är den kontrollansvarige och oftast en byggherre närvarande.

Syftet med denna uppsats är att undersöka kontrollansvarigas och byggherrars tankar om kvalitéten på arbetsplatsbesöken motsvarar plan- och bygglagskommitténs intention till att införa obligatoriska arbetsplatsbesök. Detta har gjorts genom intervjuer med kontrollansvariga och byggherrar i två olika kommuner.

Intervjuerna visar att införandet av det obligatoriska arbetsplatsbesöket upplevs positivt men det finns fortfarande förbättringspotential. En av utvecklingspotentialerna handlar främst om brist på erfarenhet hos de yngre handläggarna. Det har även framkommit att det råder brist på resurser för att kunna utföra arbetsplatsbesöken i den omfattning som önskas.

Det framkommer också att den nya plan- och bygglagen lämnar ett stort utrymme för egen tolkning av lagen, vilket har lett till att det är svårt att avgöra om ett arbetsplatsbesök har utförts på ett korrekt sätt.

Abstract [en]

It has now been five years since the new Planning and Building Act (Plan- och bygglagen) came into force, in which the mandatory workplace visit was introduced. The introduction was based in that the authorities had not previously had such a good insight into the construction work around the country. To increase transparency, the authorities introduced mandatory workplace visits. At a workplace visit conducted by an officer who represents the building committee is the control manager, and usually a developer present.

The purpose of this essay is to examine the control manager´s and developer´s thoughts on the quality of workplace visits corresponds to the Planning and Building Committee's intention to introduce mandatory workplace visits. This has been done through interviews with control managers and developers in two different municipalities.

The interviews show that the introduction of the mandatory workplace visit is perceived positively but there is still potential for improvement. One of the development potential is mainly about the lack of experience of the younger officers. It has also emerged that there is a lack of resources to carry out workplace visits, to the extent desired.

It also emerged that the new Planning and Building Act (Plan- och bygglagen) leaves a lot of room for your own interpretation of the law, which has led to difficulties to determine whether a workplace visit has been carried out correctly.

Place, publisher, year, edition, pages
2016. , 40 p.
Keyword [en]
Building permits, workplace visit, control manager, developer, Planning and Building Act, building permit process
Keyword [sv]
Bygglov, arbetsplatsbesök, kontrollansvarig, byggherre, plan- och bygglagen, bygglovsprocessen
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:oru:diva-52437OAI: oai:DiVA.org:oru-52437DiVA: diva2:972512
Subject / course
Construction Engineering
Supervisors
Examiners
Available from: 2016-09-21 Created: 2016-09-21 Last updated: 2016-09-21Bibliographically approved

Open Access in DiVA

fulltext(221 kB)0 downloads
File information
File name FULLTEXT01.pdfFile size 221 kBChecksum SHA-512
bd34363ebbf039b5ebd940e3d47e364802bbe3080e19af4af9d4b45912e3c0e61ddb3d03a6b0e920e4727e6335e6e4424258d452f6c816bdcc885327f95615f9
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology, Örebro University, Sweden
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

ReferencesLink to record
Permanent link

Direct link