Change search
ReferencesLink to record
Permanent link

Direct link
Analys RadioNy: En studie om utmaningar och möjlighetervid integration av nytt radiosystem
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2016 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

This thesis has been conducted at the Swedish Defense Materiel

Administration (FMV) on the department of mobile command center

with supervised by ÅF. FMV Mobile Command centers main task is to

integrate communication systems into Swedish Armed Forces (FM)

vehicle systems.

FMV has conducted a new radio system that will be integrated in

FM. In communications systems various interfaces as mounting

interface and connections interface frequent occurs.

A mounting interface is an interface were the radio is mounted

into a mounting frame or matching, connection interface is the

cables and contacts or interfaces similar. During the procurement

of the new radio system no requirements were written in the

specification that it should fit in the existing mounting

interface called mounting frame 42/48. Nor did the connection

interfaces stated requirements in detail. The problem formulation

of this thesis reads; How is it possible for FMV to work with

integration of the new communications system in FM vehicles to

create the best conditions, inside the boundaries that is given

for this thesis?

To get an understanding how integration can be better in FMV,

questions were formulated from FMV, which are underlying the

further work. A good foundation for the analysis are made from the

feasibility on how a specification is written in FM, which laws

that would have an effect for public authority and which methods

and manuals that is available to aid. Interviews are then

conducted with staff from FMV and with co-workers on the concept

plant in Enköping, a lot of the tryouts of the new communication

systems are done. Four different mounting system concepts on how

the integrations can be done are evaluated and analyzed to get to

a standing point.

The conclusion from the analyze of the mounting frame concepts is

that an updated version of the existing mounting frame could be

the best. With the addition that the new acquired mounting frame

also should have the potential to mount older radio systems. A

mounting frame adjusts for the new radio system at the same time

as the older fits.

In this conclusion recommendations are presented on what FMV could

work on to achieve better conditions for the integrations of

communications systems.

Conclusions that the start of a project is the most important

factor, for the whole project to be made. The importance of the

knowledge of a change late in a project is much more expensive

than early in a project and the project participants have easier

to get a clear picture if it is a good startup of a project.

To find a common connection interface for the radio systems was

not seen as a solution. Instead it is proposed to work with

standards where it is possible and detail specifications where it

is needed.

ISRN UTH-

Place, publisher, year, edition, pages
2016.
Keyword [sv]
RadioNy, Mobila Ledningsplatser, TTEM, LOU, LUFS, Fästram, Gränssnitt, Kravställning
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:uu:diva-303417ISRN: UTH-INGUTB-EX-M-2016/25-SEOAI: oai:DiVA.org:uu-303417DiVA: diva2:971774
Educational program
Bachelor Programme in Mechanical Engineering
Supervisors
Examiners
Available from: 2016-09-19 Created: 2016-09-19 Last updated: 2016-09-19Bibliographically approved

Open Access in DiVA

fulltext(4726 kB)5 downloads
File information
File name FULLTEXT01.pdfFile size 4726 kBChecksum SHA-512
37ad91b89bbbeb9f1d9039b7de34894eb113bbb9d544600f4d92fa0b0e5a6d5aea0147ca94f41a2ee09c4bc2ed8f29c8b254e43294c5182d98dc5cda96ccfa3a
Type fulltextMimetype application/pdf

By organisation
Industrial Engineering & Management
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 5 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 20 hits
ReferencesLink to record
Permanent link

Direct link