Change search
ReferencesLink to record
Permanent link

Direct link
Cut & Cover- betongtunnlar: Tids- och kostnadsanalys i Norsborgsdepån.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2016 (Swedish)Independent thesis Basic level (university diploma), 5 credits / 7,5 HE creditsStudent thesisAlternative title
Cut & Cover concrete tunnels : A cost- and time analysis from the Norsborg depot. (English)
Place, publisher, year, edition, pages
2016. , 23 p.
Series
Examensarbete Byggnadsteknik, BP2016; 03
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kth:diva-191294OAI: oai:DiVA.org:kth-191294DiVA: diva2:955867
Subject / course
Facilities for Infrastructure
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2016-08-26 Created: 2016-08-26Bibliographically approved

Open Access in DiVA

fulltext(13003 kB)7 downloads
File information
File name FULLTEXT01.pdfFile size 13003 kBChecksum SHA-512
a261587a6c9ff98ebbc9fb5394f65a1f1284370cfcef58001f2dc45ca3cd7a845ada099bfe21d9ffa497edb248a61a93bd752c4d47d68040facc31808d2cf59f
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 7 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 29 hits
ReferencesLink to record
Permanent link

Direct link