Change search
ReferencesLink to record
Permanent link

Direct link
Uppföljning av va-projekt med hjälp av nyckeltal: Med fokus på tid för arbetare, grävmaskin och transporter
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2016 (Swedish)Independent thesis Basic level (university diploma), 5 credits / 7,5 HE creditsStudent thesisAlternative title
Follow-up of pipe projects with key performance indicators : With focus on time for worker, excavator and transports (English)
Place, publisher, year, edition, pages
2016. , 29 p.
Series
Examensarbete Byggnadsteknik, BP2016;17
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kth:diva-191098OAI: oai:DiVA.org:kth-191098DiVA: diva2:954755
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Supervisors
Examiners
Available from: 2016-08-23 Created: 2016-08-23Bibliographically approved

Open Access in DiVA

fulltext(11992 kB)5 downloads
File information
File name FULLTEXT01.pdfFile size 11992 kBChecksum SHA-512
6b3c58f097da9d5ca99d6e9a5386a236894c40fb47e9f42c05c2dcb9d5609c15d19e155f609d9d2f2d58763ad1aff522d64d074988441ac979591eb477b0362f
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 5 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 13 hits
ReferencesLink to record
Permanent link

Direct link