Change search
ReferencesLink to record
Permanent link

Direct link
Utvärdering av lean-mognaden på två svenska företag
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Evaluation of lean maturity in two swedish companies (English)
Abstract [en]

Purpose - The purpose of this thesis is to investigate how two Swedish companies conduct their lean work, what similarities and differences they have in their lean-maturity and also how a higher level of lean-maturity can be generated.  To fulfil the purpose the following three questions where formulated:


  1. How do the two companies conduct their lean work?
  2. What level of maturity do the companies have in their lean-work and what similarities and differences occur between them?
  3. What should the companies focus on to reach a higher level of lean maturity?


Method - To fulfil the purpose of this thesis a literature review and case study was conducted in two companies. The companies are referred to as company X, and Y in the report. The case study was conducted through a survey, interviews and observations. The data were compared with a theoretical framework and generated into the study´s results.


Findings - Both companies conducted their lean-work in a successful way, which means that they have a higher lean-maturity level than the average in Sweden. Generally it is about building a solid foundation and then gets the employees to follow the system that was built up. The result of the thesis showed that both companies have a higher level of maturity then the Swedish incision within all the 14 principles but despite this both companies have a lot to improve.  In the thesis multiple improvement suggestions have been made for the companies and the first thing they need to focus on are to build a solid foundation in the lean philosophy. The companies need to create a common target and get a functional system to be able to higher their maturity level. Another important factor is to focus on lean- and leadership-education, which will result in a higher level of knowledge.


Implications - The thesis have resulted in a few areas for improvements for both companies.  Other companies with the same conditions as case X and Y can probably identify their level of maturity and also follow the suggested improvements that are presented. In the thesis no new theories have been used instead existing theories have been used but in a different context.


Limitations - The thesis contains a two case study since the study is conducted in two companies. The thesis could easily been conducted in even more companies to get the result more trustworthy and also get higher generalizability. The survey that was used in the thesis had a few flaws since it is general and takes a production perspective. Since companies usually never work with lean in the same way the flaws may have affected the result of the thesis.

Keywords - Lean, Maturity, Assessment, Lean 14 principles


Place, publisher, year, edition, pages
2016. , 56 p.
JTH research report, ISSN 1404-0018
Keyword [sv]
Lean, Mognad, Utvärdering, Leans 14 principer
National Category
Engineering and Technology
URN: urn:nbn:se:hj:diva-31116ISRN: JU-JTH-IGA-1-20160040OAI: diva2:949146
Subject / course
JTH, Industrial Engineering and Management
Available from: 2016-07-18 Created: 2016-07-17 Last updated: 2016-07-18Bibliographically approved

Open Access in DiVA

fulltext(6273 kB)3 downloads
File information
File name FULLTEXT01.pdfFile size 6273 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Junefelt, EmilieOlofsson, Ellen
By organisation
JTH, Industrial Engineering and Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 3 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 15 hits
ReferencesLink to record
Permanent link

Direct link