Change search
ReferencesLink to record
Permanent link

Direct link
Entreprenörens risker vid övergången från utförandeentreprenader till totalentreprenader!: En nulägesanalys som skildrar entreprenörens perspektiv i väg och anläggningsprojekt.
Halmstad University, School of Business, Engineering and Science.
2016 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

When clients more often choose to transfer from” traditional” design-bid-build contracts to design-build contracts it creates consequences of risks and possibilities for all involved parties. In collaboration with Skanska as a case company and their division “Väg och Anläggning i Väst”, this thesis was conducted as a qualitative study with the intention to examine what consequences it have on the contractor when an increased amount of contracts transfer from design-bid-build to design-build.

This thesis shows that the contractor agrees that there are some difficulties with design-build contracts, and that the transition from design-bid-build to design-build takes place in a relatively short time, also that the contractor and the client lack the experience and skills required to perform a good project without major complications.

Many of the problems that occur today can be derived to individuals and their communication skills, by increasing cooperation and open up for a better dialogue between the parties, which creates opportunity for both the client and the contractor to gently adjust to the changes that the transition to design-build contracts means.

An Increased cooperation and a more open communication, will result in better working conditions and a better end product. 

Place, publisher, year, edition, pages
2016. , 62 p.
Keyword [sv]
Totalentreprenad, Utförandeentreprenad, Risker, Väg, Anläggning
National Category
Construction Management
URN: urn:nbn:se:hh:diva-31568OAI: diva2:946744
Subject / course
Available from: 2016-07-06 Created: 2016-07-05 Last updated: 2016-07-06Bibliographically approved

Open Access in DiVA

fulltext(3164 kB)11 downloads
File information
File name FULLTEXT02.pdfFile size 3164 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
School of Business, Engineering and Science
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 11 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 47 hits
ReferencesLink to record
Permanent link

Direct link