Detaljplaneprocessens tidsåtgång:En djupanalys av två detaljplaner i tre kommuner
KTH, School of Architecture and the Built Environment (ABE), Urban Planning and Environment, Urban and Regional Studies.
2016 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
The time-cost of the planning processes:An in-depth analysis of two detailed development plans in three municipalities (English)
Abstract [sv]

Bakgrunden till detta examensarbete har sin grund i den bostadsbrist som finns i Sverige idag och den allmänna debatten om ökat bostadsbyggande och långsamma planprocesser som pågår.

I studien har två detaljplaner, med huvudändamål bostäder, i var och en av de tre kommunerna Botkyrka, Norrköping och Västerås djupgående analyserats, i syfte att bringa klarhet i vilka aktiviteter och komponenter som faktiskt ger upphov till tidsåtgång i detaljplaneprocessens olika skeden. Av studien, vars tillvägagångssätt baserats på dokumentanalyser och intervjuer, framgår att detaljplaneprocessen utifrån sin utformning samt uppbyggnad via plan- och bygglagen (PBL) tar ”tid”. Hur lång tid en process tar beror enligt studien på flera olika anledningar som kan ha med den specifika planen och/eller kommunen att göra. Resultatet av undersökningen visar på att det i ett tidigt skede är väldigt svårt att uppskatta tidsåtgången för en detaljplan, då alla planer till viss del är unika och då oförutsebara komponenter och aktiviteter vanligtvis dyker upp under processens gång.

Tidsåtgången för detaljplaneprocessen, räknat från det att ett formellt planuppdrag ges till det att detaljplanen vinner laga kraft, har för de planer som studerats i arbetet kraftigt varierat mellan 21 månader till 7 år. I snitt har dock processen för samtliga planer endast aktivt bedrivits under 1,5 – 3 år. Anledningen till att arbetet med vissa detaljplaner avstannat eller fördröjts har bland annat med oerfarna byggherrars brist på kunskap, politisk oenighet, sena inspel och bristen på resurser att göra. Enligt studien är de aktiviteter som ger upphov till störst tidsåtgång i detaljplaneprocesserna framförallt kopplade till utredningsarbetet. Det handlar både om att det är många utredningar som behöver tas fram och att de tar tid.

Av studien framgår att tidseffektiviseringar i planprocessen är önskvärt så länge kvalitén kan bibehållas och detaljplanernas genomförbarhet kan säkerställas. Bostadsbristen i regionerna och det höga trycket i kommunerna lyfts fram som aspekter till varför det är viktigt. De förslag till förbättringsåtgärder som framhålls i denna studie handlar bland annat om att få till stånd bättre former för tidig samverkan mellan involverade parter, att ge den strategiska planeringen större tyngd och att utreda mer i ett tidigt skede, att skapa tydliga kommunövergripande mål och prioriteringsordningar för detaljplaner samt förbättra kommunens system och arbetsrutiner. Utöver det omnämns även ett behov av att utöka kommunens resurser och att öka tydligheten i vilka beslut som behöver fattas politiskt och på vilken nivå samt om det finns beslut som kan delegeras till kommunernas förvaltningar.

Abstract [en]

The background of this master thesis stems from the housing shortage that exists in Sweden today and the general debate on increased housing and slow planning processes that are currently taking place.

In this study an in-depth analysis of two detailed development plans in each of the three municipalities of Botkyrka, Norrköping and Västerås has been carried out, in order to shed light on which activities and components that give rise to time consumption in the various stages of the planning process. The study, which is based on document analysis and interviews, concludes that the Swedish planning process due to its overall design and by being regulated by the Swedish planning and building act (PBL) takes "time". How much time the process takes depends, according to the analysis, on several different reasons that may have with the specific detailed development plan and/or the municipality to do. The result of the case studies carried out in this master thesis shows that it’s very difficult in an early stage to estimate how much time that will be required in order to create a detailed development plan. The reason for this is that every plan is somewhat unique and that unforeseeable components and activities usually emerge during the process.

The time-cost of the planning process for the detailed development plans studied in this master thesis varied greatly from 21 months to 7 years. On average, however, the process for all the plans was only actively pursued during 1,5 - 3 years. The reason that the development of some of the plans was delayed or postponed has to do with, among other things, inexperienced developers lack of knowledge with regards to the planning process, political disagreements, belated demands for additional investigations and shortage of staff. According to this study, conducting surveys and investigations are the most time consuming activities within the planning process. It is a combination of many surveys needed to be carried out and that each one of them takes time to complete.   

The result of this study shows that more time-efficient planning processes are desirable as long as the quality can be maintained and the feasibility of the detailed development plans can be guaranteed. The housing shortage in the regions and the high pressure to draw up plans and build homes in the municipalities are brought up as aspects of why it is important. The improvements that are suggested in the study involves, among others things, establishing better forms of early collaboration between all parties involved, giving the strategic planning greater weight and conducting more surveys in an early stage, creating clear common goals and priorities within the municipality's and furthermore improve the municipality's systems and working practices. In addition, it is suggested that the municipality's resources should be extended and that there should be an increased transparency regarding which decisions in the planning processes that need to be made politically and at what level, and if there are decisions that can be delegated to the municipality’s administrations.

Place, publisher, year, edition, pages
2016. , 117 p.
Series
SoM EX, 2016-14
Keyword [en]
Planning process, detailed development plan, time-cost, efficiency
Keyword [sv]
Planprocessen, detaljplan, tidsåtgång, effektivitet
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-188898OAI: oai:DiVA.org:kth-188898DiVA: diva2:940433
Educational program
Master of Science in Engineering - Urban Management
Supervisors
Examiners
Available from: 2016-06-21 Created: 2016-06-21 Last updated: 2016-06-21Bibliographically approved

Open Access in DiVA

fulltext(22306 kB)97 downloads
File information
File name FULLTEXT01.pdfFile size 22306 kBChecksum SHA-512
9f1c806436175725cec42fa45f894fea642109ca7b700a35d0641d5c2c032027f180c448b4902d3f537708152fb7d4f1d670b8eda091047b8b4ba54a91847b1f
Type fulltextMimetype application/pdf

By organisation
Urban and Regional Studies
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 97 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 235 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf