Förbättringsarbete för projektprocesser - Kommunicera, strukturera, standardisera.
Mälardalen University, School of Innovation, Design and Engineering.
Mälardalen University, School of Innovation, Design and Engineering.
2016 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Today it is required that industrial companies are continuously searching for new improvementopportunities to streamline processes so that they can be competitive on the market. One way to succeed is to standardize and map processes to structure the work and clarify possible weaknesses.The purpose of this study is to examine the problems and uncertainties in the project-process which can be reduced, dealing with new projects. Which project-models and standardizations should be established for the project-process to achieve a maximum flow through the project. The goal of the study is that these project-models and standardizations in turn will facilitate the management of projects by clarifying responsibilities, support communication, and reduce uncertainties. To reach an answer three questions has been raised:- How can implementing project-models improve the existing project-process, dealing with new projects?- How can standardized templates and checklists be used to reduce uncertainties and problems in a project-process?- What measures should take place to eliminate the loss of information between differentdepartment within an organization and between external parties?

This study has been executed according to Six Sigma’s systematic methology DMAIC that facilitated and clarified the studys structure and planning. Through this method the study has been divided into five natural stages. The study is bases on both primary and secondary-data.

In the study result it showed that there are several factors which are limiting the project-process flow. One factor that turned out to be a very considerable for a well-functioning project processwas communication between all parties. This covers both internally and externally. Defective communication leads to uncertainties in the responsibilities, work duties and increased lack ofessential information/data. Through the implementation of standardized project-models such as Flowchart and a Kanban-board could work duties, responsibilities and information become clarified and uncertainties be reduced. 

Place, publisher, year, edition, pages
2016. , 91 p.
National Category
Production Engineering, Human Work Science and Ergonomics Engineering and Technology
URN: urn:nbn:se:mdh:diva-31860OAI: diva2:936338
Subject / course
Product and Process Development
Available from: 2016-06-20 Created: 2016-06-13 Last updated: 2016-06-20Bibliographically approved

Open Access in DiVA

fulltext(1777 kB)10 downloads
File information
File name FULLTEXT01.pdfFile size 1777 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
School of Innovation, Design and Engineering
Production Engineering, Human Work Science and ErgonomicsEngineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 10 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 35 hits
ReferencesLink to record
Permanent link

Direct link