Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Installation Marinfloc: En redogörelse för installationen av en ny länsvattenseparator ombord på Calmare Nyckel
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 HE creditsStudent thesis
Abstract [sv]

Ombord på Sjöfartshögskolans fartyg Calmare Nyckel, fanns en anläggning för rening av oljehaltigt vatten. Eftersom anläggningen började bli gammal och det var svårt att få tag i reservdelar, samt att nya innovativa lösningar uppkommit under senare år, önskade skolan byta ut den gamla anläggningen mot en ny från Marinfloc AB.

 

Författarna till denna rapport fick i uppdrag av skolan att ta fram installationsunderlag i form av ritningar, materialförteckningar samt instruktioner på hur arbetet bör genomföras. Även en analys skulle genomföras, där den gamla och den nya anläggningen jämfördes med avseende på renhet hos det separerade länsvattnet.

  

Syftet med projektet var att ersätta befintlig länsvattenseparator mot en ny modernare anläggning, få den besiktigad och godkänd av berörda myndigheter. Syftet med denna rapport är att redogöra för projektets genomförande, enligt projektdirektivet.

 

Resultatet av projektet var att Calmare Nyckel blev utrustad med en fullt fungerande, modern anläggning för rening av länsvatten. Den nya anläggningen renade länsvattnet mycket effektivt och bidrar därmed till mindre med föroreningar i världens hav.

Abstract [en]

On board the Maritime Academy vessel Calmare Nyckel, they had equipment for treatment of oily water. Since the equipment was beginning to get old, and that it was difficult to find spare parts, as well as new innovative solutions had arisen in recent years, the academy wanted to replace the old equipment with new from Marinfloc AB.

 

The authors of this report were assigned by the academy to provide the installation basis in form of drawings, material list and instructions on how the work should be carried out. Also an analysis would be carried out, where the old and the new equipment were to be compared with regard to the purity of the separated bilge water.

 

The purpose of the project was to replace the existing oily water separator with a new modern one, get it inspected and approved by authorities. The purpose of this report is to give account for the project implementation in accordance to the projects directive.

 

The result of the project was that Calmare Nyckel had been equipped with a full functioning, modern equipment for purification of bilge water. The new equipment purified bilge water very efficient, thereby contributing to less pollution in the world's oceans.

Place, publisher, year, edition, pages
2016. , 100 p.
Keyword [en]
Oily bilge water; Separator; Marinfloc AB; Calmare Nyckel
Keyword [sv]
Länsvatten; Länsvattenseparator; Marinfloc AB; Calmare Nyckel
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:lnu:diva-50557OAI: oai:DiVA.org:lnu-50557DiVA: diva2:910853
External cooperation
Uppdrag: Sjöfartshögskolan i Kalmar, Samarbete: Marinfloc AB i Varekil
Educational program
Marine Engineering Programme (3 years), 180 credits
Supervisors
Examiners
Projects
Installation Marinfloc
Available from: 2016-03-14 Created: 2016-03-10 Last updated: 2016-03-14Bibliographically approved

Open Access in DiVA

fulltext(13291 kB)