Change search
ReferencesLink to record
Permanent link

Direct link
Bättre arbetsberedningar med hjälp av BIM: Hur de kan utformas för implementering av BIM
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Applied Mechanics, Byggteknik.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Better work preperations using BIM : How they can be structured to implement BIM (English)
Abstract [en]

During the past years Building Information Modelling (BIM), which is a digital way to work, has begun to spread amongst the parts of the construction process. At the construction phase the larger companies has started using the new way to work. This expansion has not been developed amongst smaller companies leading to the purpose of this report, to investigate in which ways the smaller companies can implement BIM by changing their way to work. The thesis is delimited to work preperations with the objective to define how the work preperations should be structured to enable the implementation of BIM. To achieve the objective of the report, information about the subject has been collected by interviews and literature studies. Among other things the interviews have shown a need of education regarding BIM. By using the computer application Autodesk NavisWorks, application areas have been found within visualization, time management and managing information. Further on the results from interviews and literature studies have been analyzed to identify the areas in which BIM can contribute to a better way of creating the work preperations. The possibility to insert appendices into the template, an elucidation of the BIM-modells application areas and working with multiple operators while creating work preperations have been mentioned.The report has eventually resulted in a suggestion of how the template for work preperations can be structured. Together with the template a document describing in which ways the BIM-modell can be used while working with the template have been made.

Place, publisher, year, edition, pages
2015. , 46 p.
Keyword [sv]
BIM, implementering, produktion, arbetsberedningar
National Category
Construction Management
URN: urn:nbn:se:uu:diva-257673ISRN: UTH-INGUTB-EX-B-2015/19-SEOAI: diva2:840099
External cooperation
Sh Bygg Sten och Anläggning AB
Educational program
Bachelor Programme in Construction Engineering
Available from: 2015-07-07 Created: 2015-07-06 Last updated: 2015-07-07Bibliographically approved

Open Access in DiVA

fulltext(1375 kB)138 downloads
File information
File name FULLTEXT01.pdfFile size 1375 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 138 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 541 hits
ReferencesLink to record
Permanent link

Direct link