Change search
ReferencesLink to record
Permanent link

Direct link
Efficient Construction Logistics, A case study of an Office Block Project
KTH, School of Architecture and the Built Environment (ABE), Real Estate and Construction Management.
2015 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Place, publisher, year, edition, pages
Keyword [en]
Construction Logistics, Material Flow, Project, Management
National Category
Engineering and Technology
URN: urn:nbn:se:kth:diva-170649Archive number: 357OAI: diva2:839478
Available from: 2015-07-02 Created: 2015-07-02 Last updated: 2015-07-02Bibliographically approved

Open Access in DiVA

fulltext(1139 kB)225 downloads
File information
File name FULLTEXT01.pdfFile size 1139 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Real Estate and Construction Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 225 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 72 hits
ReferencesLink to record
Permanent link

Direct link