Integrated schedule and cost risk analysis using risk drivers in construction projects in Vietnam: A case study in a construction project in nam arun chaiseri LTD
KTH, School of Industrial Engineering and Management (ITM), Applied Mechanical Engineering (KTH Södertälje).
2010 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Place, publisher, year, edition, pages
National Category
Engineering and Technology
URN: urn:nbn:se:kth:diva-170352OAI: diva2:827843
Educational program
Master of Science - Project Management and Operational Development
Available from: 2015-06-29 Created: 2015-06-29 Last updated: 2015-06-29Bibliographically approved

Open Access in DiVA

fulltext(2522 kB)154 downloads
File information
File name FULLTEXT01.pdfFile size 2522 kBChecksum SHA-512
Type fulltextMimetype application/pdf

By organisation
Applied Mechanical Engineering (KTH Södertälje)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 154 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 73 hits
ReferencesLink to record
Permanent link

Direct link