Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Optimering av modelleringsteknik i BIM: I samarbete med Peab Sverige AB
Karlstad University, Faculty of Health, Science and Technology (starting 2013).
Karlstad University, Faculty of Health, Science and Technology (starting 2013).
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Optimizing the technique of modeling in BIM : A cooperation with Peab Sweden AB Sweden (English)
Abstract [sv]

Building Information Modelling, ByggnadsInformationsModellering på svenska eller mer känt som förkortning BIM är en arbetsmetod som kan tillämpas inom byggbranschen. Denna moderna digitala metod tar projektering till en helt ny nivå. Genom informationsutbyte av relevant information för projektet utifrån en avancerad BIM-modell kan projektet effektiviseras. För att få en korrekt BIM-modell, eller en objektsbaserad modell som det också kan kallas, är det viktigt att de olika disciplinerna samarbetar i framtagningen. En BIM-modell har enligt många studier och rapporter stora fördelar för de inblandade aktörerna; reducering av kvalitetsfels- och produktionskostnader samt samordning och kollisionskontroller för att nämna några. Men för att kunna ta del av dessa fördelar måste det vara tydligt i hur beställaren av en modell ställer sina krav.

Peab Sverige AB har i dagsläget ett stort intresse inom BIM och tillämpar det till viss grad. De ser stora fördelar med metoden och håller ständigt på att förbättra arbetsprocessen. Karlstadskontoret har önskan om att kunna använda BIM-modellerna i deras kalkyleringsarbete, och sättet som många konsulter modellerar på i dag fyller inte den önskade funktionen Peab eftersträvar. Modellerna är inte produktionsanpassade. Syftet med arbetet är att underlätta samarbetet mellan entreprenören Peab och dess externa konsulter i modelleringsdelen i framtagandet av en BIM-modell, för att undvika merarbete senare i kalkyleringsskedet. Detta ska uppfyllas genom att ta fram ett underlag för hur konsulter skall modellera så att entreprenören kan använda sig av modellen fullt ut. Arbetet ligger även till grund för ett kompendium som konsulterna kan använda sig utav där objektsindelningen blir produktionsanpassad och på så sätt tillfredsställer Peabs kalkylatorer.

Med hjälp av en byggd teoretisk grund, intervjuer av berörda partner och granskning av Peabs BIM program blev en objektsindelning av 2D-detaljsektioner enligt SBEF:s byggdelstabell aktuell. Tankar och åsikter hämtades från Peabs BIM-samordnare, kalkyl Peab samt tre externa konsultfirmor Tengbom, Mondo Arkitekter och Integra för att skapa ett modelleringstekniskt underlag.  

Resultatet av arbetet slutade i ett kompendium där ritande konsult får en visuell hjälp om hur Peab vill ha sin BIM-modell modellerad. Detta blir en hjälp för att överbygga det glapp som råder mellan ritande instans och entreprenören. Detta kompendium blir en bilaga till den rådande BIM-manual som Peab skickar ut till samtliga deltagande aktörer i deras BIM-projekt. Mötena med konsulterna resulterade i vetskapen om att en modellering på det önskade sättet var möjligt, men att det skulle ta längre tid att uppföra en sådan modell vilket i sin tur betyder en ökad kostnad för beställaren. För att det ska bli standardiserat att göra på det här sättet innebär att Peab måste se vinning i att lägga ner mer pengar på projektörerna, något som blir svårt att motivera då det kan vara svårt att mäta de vinster en korrekt BIM-modell medför. En sådan utredning skulle väga tungt och en önskvärd effekt är en implementering av BIM i hela byggbranschen.

Abstract [en]

Building Information Modeling, or more known as BIM, is one of the most up-to-date working process within the construction industry. This advanced digital high end model brings projection to a whole new level. By the exchange of information which is stored within the model, every involved participant has easy access to relevant information needed for the project. To get an accurate BIM-model, or an object-based model which it also could be called, every participant has to strive against a common goal for a successful result. The BIM-method has, according to a lot of different studies, a very positive impact on the whole project such as being able to minimize errors as a result of miscommunication, early identification of potential clashes and detection of collisions. To receive these benefits the requirements from the requested model has to be clearly presented. 

Peab Sweden AB, one of the biggest companies in the construction industry in Sweden, has a huge interest in this method and uses BIM to manage some of their projects. The office in Karlstad, Sweden, has the desire to be able to use BIM-models in their calculation work. Today’s modeling by the consultants is not filling the desired function Peab aspire because the models aren’t adapted to production. The purpose of this study is to facilitate the cooperation between the contractor Peab and its external consultants in the development of a BIM-model to avoid additional work in the calculation stage. In order to close the gap this study will create an illustration of how the consultants should model. The study will also provide the basis to create a compendium which the external consultants can use where object classification is adapted to production and will satisfy Peab’s calculators.

With the help of a built theoretical foundation, interviews with relevant partners and understanding of Peab's BIM-programs, an object classification according to SBEF's building component table became the best option. Thoughts and opinions were taken from BIM-Coordinator and calculators from Peab and three external consulting firms Tengbom, Mondo Architects and Integra to understand different modeling techniques and getting knowledge of what’s possible to model by different CAD-programs.

The result of the study ended up in a compendium to give the consultant a visual aid how Peab wants their models. This guideline will help close the existing gap between the drawing consultants and contractor. The compendium will be used as an attachment to Peab’s current BIM-manual which is sent out to every participant when BIM-project is appropriate. The meetings with the consultants verified that a modeling based on the compendium was possible, but it would take longer to build such a model, which also means an increased cost. In order to standardized this model-based method Peab has to see the benefits in putting down more money on project planners, which will be difficult to justify when it may be difficult to measure the profits.

Place, publisher, year, edition, pages
2015.
Keywords [sv]
BIM, optimering, 3d-modellering, modell, Peab, kalkyl, kalkylering, CAD, mängdning, produktionsanpassa
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kau:diva-36706OAI: oai:DiVA.org:kau-36706DiVA, id: diva2:825260
External cooperation
Peab Sverige AB
Educational program
Study Programme in Building and Construction Engineering
Supervisors
Examiners
Available from: 2015-08-25 Created: 2015-06-23 Last updated: 2015-08-25Bibliographically approved

Open Access in DiVA

fulltext(2637 kB)122 downloads
File information
File name FULLTEXT01.pdfFile size 2637 kBChecksum SHA-512
e9af6c6352611f78d22270dc80760c9cc18f6e0e83108a7f115795414315a2663c63be685feebb1d3d5e2bf6f182daa8cae7b8b0aa44beb2aed45ff3e5df82d3
Type fulltextMimetype application/pdf
Arkivfil(2615 kB)154 downloads
File information
File name FULLTEXT02.pdfFile size 2615 kBChecksum SHA-512
ff327c3e3d5b74b9f7f777b427dc67aa45fa8e1b5664d370492209170e60c0cc7487e34acaada550884a31e0c8059c345f0cfd33466499f84b358ccab048dd89
Type fulltextMimetype application/pdf

By organisation
Faculty of Health, Science and Technology (starting 2013)
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 276 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 653 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf