Riskhantering i infrastrukturprojektet Varbergstunneln
Halmstad University, School of Business, Engineering and Science.
Halmstad University, School of Business, Engineering and Science.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Risk management in the infrastructure project Varberg tunnel (English)
Abstract [sv]

Syfte: Syftet är att beskriva och analysera riskhantering av projektrisker och finansiella risker i infrastrukturprojektet Varbergstunneln under planeringsfasen där två aktörer har studerats, Trafikverket och Varbergs kommunala verksamhet, och deras perspektiv på riskhantering och hur dessa aktörers perspektiv skiljer sig åt för att få förståelse för hur olika typer av risker och aktörer riskhanterar utifrån deras perspektiv i ett infrastrukturprojekt.

Bakgrund och problem: Trafikverkets uppgift är att se till att tågen kommer i tid, transporter sker så säkert som möjligt och med minsta möjliga miljöpåverkan. Tillsammans med andra aktörer ska de se till att den bästa möjliga samhällsnyttan skapas för pengarna. Den 21 mars 2013 kom regeringens tillåtlighetsbeslut för delprojektet genom Varberg för att bygga ut järnvägen från enkelspårig till dubbelspårig. Detta är en av de största utmaningarna i Varbergs kommun där den kommunala och den statliga planeringen måste gå hand i hand. Det finns stora risker kopplat till infrastrukturprojekt men det finns också stor möjlighet till samhällsekonomisk lönsamhet. Att identifiera risker kräver ett generellt tillvägagångsätt eftersom att individer inte innehar all den informationen som krävs för att veta vart alla diverse risker befinner sig i verksamheten. Problemet med riskvärdering är att kunskapen om vilka som påverkar vid tunnelprojekt är knappa. Verksamheter behöver hantera risker och verksamheter som inte gör det är mer sårbara om de ignorerar risk, betraktar risk som deras fiende eller endast planerar för en enda framtid.

Forskningsfråga: Hur utförs riskhantering av projektrisker och finansiella risker i infrastrukturprojektet Varbergstunneln under planeringsfasen?

Metod: Den här uppsatsen är en kvalitativ studie där vi som författare har använt en induktiv ansats. Empirin har samlats in från tre olika intervjuer kopplat till Varbergstunneln. 

Resultat: Den största skillnaden mellan aktörerna är omfattningen av riskhanteringen och hur de metodiskt arbetar. Trafikverket genomför ett mycket större riskhanteringsarbete än Varbergs kommunala verksamhet. Riskidentifieringen är mer likartat mellan aktörerna, skillnaden är hur de metodiskt arbetar. Riskvärderingen är kvalitativ hos Trafikverket och kvantitativt hos Varbergs kommunala verksamhet. Hantering av risk genomförs inte på något metodiskt sätt hos Varbergs kommunala verksamhet, det enda som hanteras är ränterisker medan Trafikverket hanterar alla risker och genomför detta på ett metodiskt sätt.

Slutsats: Riskhanteringen utförs på olika sätt beroende på vilket perspektiv aktören har och vilken typ av risk som riskhanteras. Riskhanteringen kan vara antingen metodisk eller icke-metodisk. Vår uppfattning är att detta beror på aktörens ansvar och hur komplicerat riskhanteringen är för aktören. Vilket perspektiv aktören har anser vi påverka om aktören är långsiktig eller kortsiktig. Trafikverket ska endast bli klar med projekteringen av tunneln medan Varbergs kommunala verksamhet ska leva med den i generationer framöver.

Abstract [en]

Purpose: The purpose is to describe and analyze the risk management of project risks and financial risks in the infrastructure project Varberg tunnel during the planning phase, in which two players have been studied, the Swedish Transport Administration and the Varberg municipal operations, and their perspective on risk management and how these actors' perspectives differ in order to get an understanding of how different types of risks and stakeholder risk manage from their perspective in an infrastructure project.

Background and problem: The Swedish Transport Administration task is to ensure that trains arrive on time, transport is done as safely as possible and with the least possible environmental impact. Together with other stakeholders they will ensure that the best possible social utility is created for the money. On 21 March 2013, the government's admissibility decision of subprojects through Varberg to extend the railway from single track to double track. This is one of the biggest challenges in Varberg municipality, where the municipal and state planning must go hand in hand. There are considerable risks associated with infrastructure projects but there are also great opportunities for socio-economic profitability. To identify risks requires a general approach because the individuals do not possess all the information necessary to know where all the various risks are within the activity. The problem with risk assessment is that the knowledge of the risks affecting the tunnel project are scarce and therefore entails difficulty in valuing them. Businesses need to manage risks, and businesses that ignore the risk, consider the risk as their enemy or plan for just one future are more vulnerable.

Research issue: How is risk management of project risks and financial risks in the infrastructure project Varberg tunnel during the planning phase?

Methodology: This thesis is a qualitative study that uses an inductive approach. The empirical data is collected from three different interviews linked to the Varberg tunnel.

Result: The main difference between the stakeholders is the scope of risk management. The Swedish Transport Administration is implementing a much larger risk management than the municipality of Varberg. Risk identification is more similar between the stakeholders, the difference is how they methodically work. Risk assessment is qualitative at the Swedish Transport Administration and quantitative at Varberg municipality. Management of risk is carried out not in any methodical way at Varberg municipality, the only manage interest rate risks while the Transport Administration manages all risks and implement this in a methodical way.

Conclusions: Risk management is carried out in different ways depending on the perspective of the stakeholder and the type of risk that is risk managed. Risk management can be either methodological or non-methodical. Our view is that this is due to the stakeholder’s responsibility and the complexity of risk management for the stakeholder. Which perspective stakeholders have, we believe, affect if the stakeholder have a long term or short term perspective. The Swedish Transport Administration will only be done with projecting of the tunnel while the municipality of Varberg has to live with it in generations to come.

Place, publisher, year, edition, pages
2015. , 69 p.
Keyword [en]
Infrastructure, risk, risk identification, risk assessment and management of risk
Keyword [sv]
Infrastruktur, risk, riskidentifiering, riskvärdering och hantering av risk
National Category
Business Administration
Identifiers
URN: urn:nbn:se:hh:diva-28562OAI: oai:DiVA.org:hh-28562DiVA: diva2:821711
Subject / course
Business
Supervisors
Examiners
Available from: 2015-06-30 Created: 2015-06-15 Last updated: 2015-06-30Bibliographically approved

Open Access in DiVA

fulltext(907 kB)141 downloads
File information
File name FULLTEXT01.pdfFile size 907 kBChecksum SHA-512
e84e3a187fbb67f252c49a7affbfc2558c0783097d8a984fc3ed6bf204b1405d68a2bc1ed9d6456f14e6bd65a8d7a1cc497cfb9534f5f5227dee03c55e5deb55
Type fulltextMimetype application/pdf

By organisation
School of Business, Engineering and Science
Business Administration

Search outside of DiVA

GoogleGoogle Scholar
Total: 141 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 213 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf