Utvärdering av VA-arbetenas framdrift på Västra Eriksberg område 1: - en fallstudie
Mid Sweden University, Faculty of Science, Technology and Media, Department of Ecotechnology and Sustainable Building Engineering.
2015 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Skanska Sverige AB i Skellefteå bedriver nu ett nybyggnadsprojekt som inkluderar allt arbete med infrastruktur i ett område där 79 stycken nya villatomter i ett tidigare obrutet område ska skapas. Då projektet genomförs i en relativt känslig miljö råder ett frågetecken kring kapacitet på framdriften med arbetet med VA, inkluderat arbete som schaktning, ledningsbädd, rörläggning, brunnar, kringfyllning och resterande återfyllning. Syftet med examensarbetet är att skapa ett underlag för resursuppföljning av VA-arbetet på område 1 i projektet Västra Eriksberg och att skapa ett underlag avseende kapacitet på framdrift i den typ av terräng samt under de förutsättningar som råder. De ingående aktiviteter i VA-arbetena kopplade till AMA-koder har kopplats ihop och tidsatt som en gemensam aktivitet. Examensarbetet har genomförts som en fallstudie och realiserats genom dagliga observationer och mätningar under en tidsperiod ute på byggarbetsplatsen. Utöver detta har fallstudien baserats på intervjuer och personlig kommunikation med produktionschef, yrkesarbetare och maskinförare. Resultatet för fallstudien tyder på att framdriftskapaciteten för arbetet med schakt och rörläggning inklusive brunnar och återfyllning på ett projekt utfört i den typ av miljö som råder på projektet Västra Eriksberg skiljer sig något, men inte mycket från generella enhetstider som finns tillgängliga på marknaden. Den enhetstid på rörläggning inklusive arbete med brunnar och återfyllning som presterats är i genomsnitt 0,273 timmar per meter ledningsgrav vilket innebär en framdrift på 3,7 meter per timme innefattande ledningar för spill- och färskvatten. Enhetstiden för arbetet med schakt är i genomsnitt 0,044 timmar per m3 vilket innebär en kapacitet på 22,7 m3 per timme. För att få ett mera korrekt resultat som visar på framdriftskapaciteten på hela område 1 hade mätningar behövt utföras under en längre period.

Abstract [en]

Skanska Sverige AB in Skellefteå now conducts a new construction project that includes all the work of infrastructure in a region where 79 pieces of new plots in a previously unbroken area are to be created. Because of the fact that the project is carried out in a relatively fragile environment is there a framing of a question over the capacity including work with the water and sewage pipes, such as the work of excavation, pipe bed, piping, wells, backfill and the remaining backfill. The aim of this thesis is to create a basis for resource monitoring work with water and sewage pipes on Phase 1 of the project Västra Eriksberg and to create a basis on capacity at the operation in the type of terrain and under the prevailing conditions. The detailed activity in the works connected to the AMA codes have been paired, and timed as a joint activity. The work has been carried out as a case study and realized through daily observations and measurements over a period of time out on the construction site. In addition, the case study was based on interviews, personal communication with the production manager, skilled workers and machine operator. The results of the case study suggests that the operating capacity for work with excavation and piping including wells and backfilling of a project carried out in the kind of environment that exists in the project Västra Eriksberg differ somewhat, but not much from the general assembly times available on the market. The unit time in the pipe laying, including work on wells and backfilling performance achieved is an average of 0.273 hours per meter trench which means a propulsion of 3,7 meters per hour, comprising pipes for wastewater and fresh water. Unit of time for the work of excavation is on average 0,044 hours per m3, which means a capacity of 22.7 m3 per hour. To get a more accurate result showing on the operational capacity of the entire Phase 1, measurements would have had to be performed over a longer period.

Place, publisher, year, edition, pages
2015.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:miun:diva-25102OAI: oai:DiVA.org:miun-25102DiVA: diva2:819044
Educational program
Building Engineering Sustainable Building TBYHG 180 higher education credits
Supervisors
Examiners
Available from: 2015-06-26 Created: 2015-06-09 Last updated: 2015-06-26Bibliographically approved

Open Access in DiVA

Utvärdering av VA-arbetenas framdrift på Västra Eriksberg område 1: - en fallstudie(9930 kB)216 downloads
File information
File name FULLTEXT01.pdfFile size 9930 kBChecksum SHA-512
260a5374197650f5ba1b7d0b81cf08da93b27db92d1eb5cf0d33a8236f00ecb8850b1d90c78de2fc01a109e4659722e31ddcd11df5e0070caa372c49c80731b1
Type fulltextMimetype application/pdf

By organisation
Department of Ecotechnology and Sustainable Building Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 216 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 184 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf