Considering Engineering Change Management in Project Realisation: The Case of Offshore Platform Projects
Mälardalen University, School of Innovation, Design and Engineering, Innovation and Product Realisation. (Innofacture)ORCID iD: 0000-0002-1224-792X
2015 (English)Licentiate thesis, comprehensive summary (Other academic)
Abstract [en]

Offshore wind converter platforms are complex installations that increase the competitiveness of offshore wind as an energy source. Prior research in the field of offshore platform project execution has focused on early project phases and planning as means to increase project reliability. Later phases such as fabrication, transport and installation have not received the same attention from academia and industry. Projects of this type frequently suffer both large and small deviations. The further projects progress, the more deviations they accumulate. The accumulated deviations have to be resolved in a timely manner so as to avoid impairing the quality and scheduling of an overall project. This research explores the design of converter platforms and the management of engineering change in relation to fabrication, transport and installation in order to increase the overall reliability of projects.

Two offshore platform projects in three case studies form the source of empirical data. The first of the three studies considered prior research connected to fabrication and installation of offshore platforms. In the second study, the effect of two different platform designs on the fabrication and installation process was investigated. The third study considered engineering change management as a tool to achieve changeability, and examined its ability to buffer against deviations affecting later project phases i.e. fabrication, transport and installation. The findings revealed that the design’s effects on a project’s outcome are often not the driver of reliability. Rather, it was found that engineering change management is essential to any project to manage the changeable nature of projects. This research also raises concerns as to how much engineering change to allow for and in what project phase. That engineering change, as a tool, should preferably be used sparingly in early phases and as necessary in later phases. The observed engineering change process in the studied projects was chaotic.  This research suggests that engineering change can be organised around change carriers. In this way, it is predicted that the processes of change can become more stable and predictable. 

Place, publisher, year, edition, pages
Västerås: Mälardalen University , 2015.
Series
Mälardalen University Press Licentiate Theses, ISSN 1651-9256 ; 212
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:mdh:diva-28057ISBN: 978-91-7485-217-2 (print)OAI: oai:DiVA.org:mdh-28057DiVA: diva2:816259
Presentation
2015-08-20, Filen, Mälardalens högskola, Eskilstuna, 10:15 (English)
Opponent
Supervisors
Funder
Knowledge Foundation
Available from: 2015-06-03 Created: 2015-06-02 Last updated: 2015-07-09Bibliographically approved
List of papers
1. MANUFACTURING ASPECTS OF OFFSHORE FABRICATION AND INSTALLATION
Open this publication in new window or tab >>MANUFACTURING ASPECTS OF OFFSHORE FABRICATION AND INSTALLATION
2014 (English)In: International Journal of Maritime Engineering, ISSN 1479-8751, E-ISSN 1740-0716, Vol. 156, 277-284 p.Article in journal (Refereed) Published
Abstract [en]

The research presented in this paper aim at identifying research commonalities between shipbuilding, offshore fabrication practices and manufacturing. As part of an exploratory effort a literature review and a case study of two offshore structures projects were performed. Research concerning shipbuilding and offshore fabrication, together with literature from other industries in construction, larger engineering projects and traditional manufacturing was reviewed. The two offshore structures projects were analyzed by means of interviews and complemented by direct observations and document reviews. The study concludes that there are gaps in the research concerned with holistic perspectives on the fabrication and installation phases of shipbuilding and offshore projects. The number of actors involved in any project of this magnitude increase barriers and communication interfaces. The dynamic nature of these types of projects was also observed and the changeability should always be a accounted factor when dealing with projects of this sort. The interviews held as part of the verification of observed phenomena in literature was limited to two projects and a single company and actors perceptions. However the collected data served well in being complementary to the literature review. It could be the task of academia to patch the gaps for overall project success, in the cases where single industry actors simply cannot see the benefit or do not have the recourses to fill them themselves. This study combines findings from traditional manufacturing industries, shipbuilding, offshore structures fabrication and large engineering projects in general.

National Category
Design Other Engineering and Technologies
Identifiers
urn:nbn:se:mdh:diva-26318 (URN)10.3940/rina.ijme.a3.302 (DOI)000342725600007 ()2-s2.0-84920099881 (Scopus ID)
Available from: 2014-10-31 Created: 2014-10-31 Last updated: 2017-12-05Bibliographically approved
2. SEMI-SUBMERSIBLE GRAVITY BASED HYBRID STRUCTURE – AN ALTERNATIVE TO JACKET AND TOPSIDE PLATFORMS
Open this publication in new window or tab >>SEMI-SUBMERSIBLE GRAVITY BASED HYBRID STRUCTURE – AN ALTERNATIVE TO JACKET AND TOPSIDE PLATFORMS
2014 (English)In: Proceedings of the International Conference on Offshore Mechanics and Arctic Engineering - OMAE, vol. 8B, 2014, 2014Conference paper, Published paper (Refereed)
Abstract [en]

The aim of this research is to present the result from a case study comparing a semi-submersible gravity based hybrid structure and a jacket topside structure for two offshore wind farm converter station projects. The cases are analyzed from a transportation and installation perspective. Converter stations enable the conversion from alternating to direct current, more efficiently bringing generated wind energy to shore. Out of the project process phases e.g. planning, engineering, fabrication, transport, installation and commissioning; transportation and installation are two of the most demanding during offshore platform projects. The weight and size of an offshore platform require specialized equipment, vessels and marine contractors’ expertise to be transported and installed. The risks associated with transportation and installation (T&I) operations are related to health, safety and environment, and T&I operations are also sensitive to any disturbance e.g. accidents and delays. Many interdependencies between disciplines in the project execution process may result in consequential and immediate impact, should an activity not follow the plan and thus the risk of cost overruns increases. In an attempt to circumvent risks related to heavy lifts offshore and consequently mitigate the corresponding risks, a new platform concept has been developed a Norwegian EPC –company and a Swiss converter station manufacturer, a semi-submersible gravity based hybrid, SSGBH. The subjects presented in this paper include the general principles of the SSGBH concept and in what way risk associated with T&I operations are reduced. This paper present the platform concepts, data gathered from interviews, archival data and direct observations. Their pros and cons are presented in an objective way, while concluding that platform concepts of this kind are and should be highly customized, as should the concept selection.

National Category
Engineering and Technology Other Engineering and Technologies
Identifiers
urn:nbn:se:mdh:diva-26795 (URN)10.1115/OMAE2014-23954 (DOI)000363498600014 ()2-s2.0-84911164008 (Scopus ID)9780791845516 (ISBN)
Conference
ASME 2014 33rd International Conference on Ocean, Offshore and Arctic Engineering, OMAE 2014; San Francisco; United States; 8 June 2014 through 13 June 2014
Projects
INNOFACTURE - innovative manufacturing development
Available from: 2014-12-03 Created: 2014-12-02 Last updated: 2015-11-19Bibliographically approved
3. ENGINEERING CHANGE MANAGEMENT IN ENGINEERING-TO-ORDER PROJECTS FROM A MANUFACTURING PERSPECTIVE
Open this publication in new window or tab >>ENGINEERING CHANGE MANAGEMENT IN ENGINEERING-TO-ORDER PROJECTS FROM A MANUFACTURING PERSPECTIVE
2014 (English)In: 6th Swedish Production Symposium SPS'14, 2014Conference paper, Published paper (Refereed)
Abstract [en]

The purpose of this research was to investigate the engineering change management process in engineering-to-order projects while comparing the same process in traditional manufacturing. A single-case study at a engineering-to-order – engineering review office was performed and results were analysed in conjuction with literature covering the engineering change process in traditional manufacturing. Engineering-to-order projects and tradional manufacturing are different in many ways but share the need for a reliant engineering change process. This study found that engineering change management post-change analysis could benefit future projects in the form of quantifiable lessons learned from previous project’s engineering change data.

Keyword
Engineering Change Management, Engineering-to-Order and Process Management.
National Category
Engineering and Technology
Identifiers
urn:nbn:se:mdh:diva-26794 (URN)
Conference
6th Swedish Production Symposium SPS'14, 16-18 Sep 2014, Göteborg, Sweden
Available from: 2014-12-03 Created: 2014-12-02 Last updated: 2015-06-03Bibliographically approved

Open Access in DiVA

fulltext(1032 kB)2732 downloads
File information
File name FULLTEXT01.pdfFile size 1032 kBChecksum SHA-512
120e8ed8131c841f9291373a26041847fe8b7033700300ff54415e1eec73d05ea330aafbcf65587e2c24417324b151515b1f3551254e6aecd132d72983a63da1
Type fulltextMimetype application/pdf

Authority records BETA

Sjögren, Peter

Search in DiVA

By author/editor
Sjögren, Peter
By organisation
Innovation and Product Realisation
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 2732 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

isbn
urn-nbn

Altmetric score

isbn
urn-nbn
Total: 1074 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf