Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Feasibility study of flow analysis methods and tools
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2014 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

Scania CV is one of the leading manufacturer of trucks in the world. Beside the truck business Scania also manufactures buses and industrial engines. A new logistic concept at Scania means major change regarding material flow to the productions lines and today Scania is lacking a tool to analyse these material flows. The underlying hypothesis is that with a tool that could analyse logistic material flows the design of new logistic flows would be more efficient and have a better quality. A case-study was done with the tool Flow Planner and in parallel interviews with logistics engineers to find out how they are working today. The conclusion is that an analysis tool similar to Flow Planner might have a positive effect on the lead time for changing the design of material flows and could therefore be one link in the chain when striving for higher flexibility. Flow Planner can model all the different Scania standard deliv-ery methods but the output gives only a part of the information that is needed in example configura-tion of the train carts. Flow Planner can give an overview of the plant and the traffic flow within the plant. It can also contribute to more accurate risk analysis concerning the congestion of traffic in plant. A weakness of Flow Planner is that forklifts and tugger trains cannot be modelled together. A risk that was exposed during the case study is that input data has errors that will give a result that is not valid. The part of the case study that was performed with data from Oskarhamn only includes on the tug-ger train delivery of units. To get a complete picture of Flow Planners capabilities and limitations it would be preferable to make similar case-studies with real data for kit, sequence and batch also.Recommendations for the continued work is to make a requirement specification to clearly define the Scania requirements and evaluate several tools.

Place, publisher, year, edition, pages
2014. , 53 p.
Series
Degree Project in Production Engineering Management, Second Level, 620
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-154994OAI: oai:DiVA.org:kth-154994DiVA: diva2:759106
Examiners
Available from: 2014-10-29 Created: 2014-10-29 Last updated: 2014-10-29Bibliographically approved

Open Access in DiVA

fulltext(1765 kB)246 downloads
File information
File name FULLTEXT01.pdfFile size 1765 kBChecksum SHA-512
a6110e0b6bd4cd9f79d9fe60e0367d7bb967feea34a86dba679965f503e2f0dad0fb7d26cbe6d48c50b2fbb60c3eaf07ad99dd0838988cef7e2898444b97f6a4
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 246 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 137 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf