TBM Tunnelling at the Stillwater Mine
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Civil and Transport Engineering.
2014 (English)MasteroppgaveStudent thesis
Abstract [en]

When considering the use of TBM as an alternative to conventional Drill & Blast tunnelling, it is of great importance to be able to give thorough and realistic performance predictions. Errors in prediction could be fatal for hard rock TBM projects, as these have a high geological risk and also demands high investment costs. This thesis is meant to provide field data to be used in the work of updating the NTNU prediction model. The effect of RPM on the rock breaking and TBM performance, as well as the effect of the rock mass fracturing have in particular been investigated. As a final purpose of this thesis laboratory testing has been performed to find the Drilling Rate Index™ and the Cutter Life Index™ of rock material. The field study of this thesis has been done at the Stillwater Mine in Montana, USA. The findings of the RPM trials conducted seem to support the notion that running the TBM at a lower RPM gives a higher basic penetration in millimeter per cutterhead revolution, and that the rock breaking process is more efficient. The effect on the rock breaking process may be explained by how the loading rate between cutter and rock surface is influenced by the speed the cutterhead rotates with. Through analyzing shift logs from the TBM in areas of high rock fracturing it has also been found that lowering the RPM will give a higher basic penetration. In this case it is however not certain if this is due to how the rock break off the surface, or if it is caused by the fact that the penetration rate in areas of high rock fracturing is limited by the muck removal capacity of the TBM conveyor. Through analysis of collected core sample data from probe drilling ahead of the TBM, it has been found that the rock mass fracturing has a strong correlation with the TBM penetration rate. It was also found that the rock mass fracturing highly influences the applicable thrust force of the TBM and thusly also has an indirect effect on the TBM performance. More work should be done at the Stillwater Mine regarding geological back mapping of the tunnel, in order to further assess the importance of the rock mass fracturing factor ks. A full laboratory testing of rock samples from the tunnel at the Stillwater Mine has been performed. Rock material in the form of both rock chips from the tunnel face and core samples from probe drilling have been tested. It was in the course of this testing observed that the Sievers' J test results are greatly different in rock chips compared with core samples. This is most likely caused by difference in mineralogy in the samples, and the fact that rock chips contain micro fractures from the rock breaking process. More work on assessing this difference should nonetheless be done.

Place, publisher, year, edition, pages
Institutt for bygg, anlegg og transport , 2014. , 183 p.
URN: urn:nbn:no:ntnu:diva-26998Local ID: ntnudaim:11563OAI: diva2:755535
Available from: 2014-10-14 Created: 2014-10-14 Last updated: 2014-10-14Bibliographically approved

Open Access in DiVA

fulltext(9268 kB)915 downloads
File information
File name FULLTEXT01.pdfFile size 9268 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)12 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf
attachment(895 kB)6 downloads
File information
File name ATTACHMENT01.zipFile size 895 kBChecksum SHA-512
Type attachmentMimetype application/zip

By organisation
Department of Civil and Transport Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 915 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 128 hits
ReferencesLink to record
Permanent link

Direct link