Optimization of Onshore Base and Hub Location Supplying Oil and Gas Installations in the Barents Sea
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Marine Technology.
2014 (English)MasteroppgaveStudent thesis
Abstract [en]

This report present an academic study of a location-routing problem combined with the fleet size and mix vehicle routing problem. Operations research (OR) is utilized to examine a concept of Statoil’s supply logistic for oil and gas installations in the Barents Sea where a hub-networks is included. The aim of this thesis is to utilize OR to determine whether it is cost-efficient for Statoil to make use of a hub system in the Barents Sea to supply three offshore installations. A simplified realistic problem is developed to define scope and limitations for the study. It comprise a set of three offshore installations and seven potential base locations. The optimal location of exactly one onshore supply base and one forward offshore base, hub, are determined. The installations are placed within given locations in the Barents Sea. The range of area span from 21°E to 36°E in longitudinal direction and from 71°N to 74°N in latitudinal direction. All facilities are open round the clock and the problem is assumed deterministic. The report present a two stage solution approach. In Phase 1, all routes are generated and parameters are calculated. In Phase 2, a set partitioning problem is solved, where routes generated in Phase 1 constitute as the columns. For comparison reasons, Phase 1 defines parameters for two different logistical scenarios. A hub-network is included in Case 1 and excluded from Case 2. Both cases build on equal assumptions and simplifications. The results from the two cases are implemented separately in a integer programming model presented in Phase 2. Results from the model are finally compared. The process is repeated a number of times, varying in the location of the offshore installations. The main results show that direct shuttle is more profitable than utilization of a hub-network for three installations. The optimum transportation costs are 6,8 million NOK and 2,2 million NOK for Case 1 and 2 respectively. Two PSVs are required for direct shuttle, where four different supply bases are optimal depending on the locations of the offshore installations. For Case 1, the Polarbase in Hammerfest is the optimal base location independent of the positions to the installations. The longest distance between optimal base and hub location is 160 [nm]. The results from the study indicate that logistic supply with hub-network is not profitable. Direct shuttle is more cost efficient for the given distances when three installations are supplied.

Place, publisher, year, edition, pages
Institutt for marin teknikk , 2014. , 146 p.
URN: urn:nbn:no:ntnu:diva-26254Local ID: ntnudaim:11125OAI: diva2:746103
Available from: 2014-09-11 Created: 2014-09-11 Last updated: 2014-09-11Bibliographically approved

Open Access in DiVA

fulltext(1681 kB)811 downloads
File information
File name FULLTEXT01.pdfFile size 1681 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)3 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf
attachment(393 kB)24 downloads
File information
File name ATTACHMENT01.zipFile size 393 kBChecksum SHA-512
Type attachmentMimetype application/zip

By organisation
Department of Marine Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 811 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 471 hits
ReferencesLink to record
Permanent link

Direct link