Change search
ReferencesLink to record
Permanent link

Direct link
Planning and Optimization of Smibelg Hydro Power Plant
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Hydraulic and Environmental Engineering.
2014 (English)MasteroppgaveStudent thesis
Abstract [en]

The purpose of this thesis report was to workout optimum solution plan for Smibelg Hydro power project. The project is located in Lurøy and RODOY regions of Norway. This thesis mainly involves reconnaissance site investigation followed by alternative layout planning design and optimization of the project scheme components using the theoretical knowledge acquired during the course of the masters programme. Simulation of energy production from the power plant has been done using nMag2004 model. Further discussions have been made on the economic viability of the project through economic and financial analysis. Finally Sensitivity analysis is used to foresee the probable outcome of changes on the course of project development and operation.

Place, publisher, year, edition, pages
Institutt for vann- og miljøteknikk , 2014. , 186 p.
URN: urn:nbn:no:ntnu:diva-26210Local ID: ntnudaim:11497OAI: diva2:745631
Available from: 2014-09-10 Created: 2014-09-10 Last updated: 2014-09-10Bibliographically approved

Open Access in DiVA

fulltext(4671 kB)1264 downloads
File information
File name FULLTEXT01.pdfFile size 4671 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)0 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf

By organisation
Department of Hydraulic and Environmental Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1264 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 66 hits
ReferencesLink to record
Permanent link

Direct link