Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Design av taktad monteringslina för glasformningssektioner
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
KTH, School of Industrial Engineering and Management (ITM), Production Engineering.
2014 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [sv]

Bucher Emhart Glass är ett världsledande företag inom glasformningsindustrin. De producerar maskiner som används vid tillverkning av glasförpackningar, så som till exempel glasflaskor, matburkar och vid förpackning av medicin. Bucher Emhart Glass erbjuder i dagsläget sina kunder fyra olika typer av maskiner, de äldre IS och AIS samt de nyare NIS och BIS. Maskinerna kan producera upp till en miljon glasflaskor per dygn.Bucher Emhart Glass har fabriker i Sundsvall, Örebro och i Malaysia. Företaget genomgår nu en omorganisation där delar av produktionen flyttas till Malaysia vilket medför att ytbehovet på dess fabrik i Sundsvall minskar och fabriken byggs om. Samtidigt har företaget valt att öka takttiden i fabriken och uppdatera materialflödet i och kring produktionslinan.Syftet med examensarbetet har varit att skapa nya linjebalanseringar för tre av maskintyperna, designa en ny layout för den minskade produktionsytan samt att planera materialflödet till linan. Arbetet har präglats av ett PDCA-tänk som tillsammans med praktik, kartläggning av nuläget, semistrukturerade intervjuer, filmning av produktionen och Lean-principerhar har lett fram till resultatet.Arbetet har resulterat i nya linjebalanseringar för maskintyperna AIS, IS och NIS samtliga med en beläggningsgrad på över 90 %. En ny layout för produktionen har tagits fram och presenteras i form av en ritning. Materialflödet har anpassats till den nya layouten och styrts så att det kommer till den station där det ska användas. Det har även bestämts hur materialet skall lagras samt vilket platsbehov det har.

Abstract [en]

Bucher Emhart glass is a world leading company in glass manufacturing. They produce machines that manufacture for example glass bottles and food jars. Bucher Emhart Glass have four different machine types, the older IS and AIS and the newer ones NIS and BIS. The machines can produce up to one million glass bottles per day.Bucher Emhart Glass has factories in Sundsvall, Örebro and in Malaysia. The company is undergoing reorganization and parts of the production are moved to Malaysia. This means that the need of space at its factory in Sundsvall decreases and therefor the factory is rebuilt. The company has also decided to increase the takt time in the factory and to update the material flow to the production line.The purpose of this master thesis is to create new production flows for each machine type, design a new layout for the reduced production area and to plan the flow of materials to the production line. The method PDCA has been used and together with analysis of the current state, semi-structured interviews, filming of the production and Lean-principles has it led to the results of this work.The thesis has resulted in a new production flow for the machine types AIS, IS and NIS all with a utilization over 90 %. A new layout for the production has been designed and is presented in the form of a drawing. The flow of material has been adapted to the new layout. It has also been determined how the material is to be stored as well as the space requirements that is needed.

Place, publisher, year, edition, pages
2014. , 102 p.
Series
Examensarbete inom industriell produktion, avancerad nivå, 603
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:kth:diva-150586OAI: oai:DiVA.org:kth-150586DiVA: diva2:744285
Examiners
Available from: 2014-09-16 Created: 2014-09-08 Last updated: 2014-09-30Bibliographically approved

Open Access in DiVA

fulltext(4061 kB)365 downloads
File information
File name FULLTEXT02.pdfFile size 4061 kBChecksum SHA-512
57de29d5493294f2f27149d3099527d98232a7ada11b36f1a57ab2e0a7d9d8d764c45b7322ebaad18097af6c604a22bfe7357e8658cff7c9669edb19106a7bf4
Type fulltextMimetype application/pdf

By organisation
Production Engineering
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 369 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 347 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf