Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering av arbetsflöde för artikeln Front plate
Örebro University, School of Science and Technology.
Örebro University, School of Science and Technology.
2014 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Optimization of Workflow for Front Plate Article (English)
Abstract [sv]

Detta examensarbete har genomförts på Linde Maskiner AB i Lindesberg. Syftet med arbetet var att effektivisera arbetsflödet för en av Linde Maskiner viktigaste produkter, Front plate. Man vill effektivisera flödet med avseende på aspekter som att minska olika former av slöserier samt att se över kvalitetsäkring över monteringsprocessen. Lean har studerats djupgående och ligger som en teoretisk grund för projektet. Lean anser vi dessutom ligga till grund för en modernisering av ett traditionellt företag. Grundliga analyser har gjorts i form av tidsanalyser, observationer och löpande samtal. Dessa analyser har skett vid monteringstationen som är den centrala processen i Front plates arbetsflöde. Analyserna visar att en effektivisering av Front plates flöde är genomförbar och förbättringsförslag har tagits fram utefter detta.

Abstract [en]

This thesis has been carried out at Linde Maskiner AB in Lindesberg. The aim of this work was to streamline the workflow for one of Linde Maskiner major products, Front plate. You want to streamline the flow with regard to aspects such as reducing various forms of wastage and to review the quality assurance of the assembly process. Lean has been studied in depth, and is as a theoretical basis for the project. Lean is according to us the basis for the modernization of a traditional company. Thorough analysis has been done in form of time analysis, observations and ongoing conversations. These analyses have been made in the assembly station which is the central process in Front plates workflow. The analyzes show that the efficiency of front plates flow is feasible and suggestions for improvement have been developed along this.

Place, publisher, year, edition, pages
2014. , 35 p.
Keyword [sv]
arbetsflöde, optimering, standardisering, LEAN, montering
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-36093OAI: oai:DiVA.org:oru-36093DiVA: diva2:740178
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2014-08-22 Created: 2014-08-22 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

fulltext(2742 kB)147 downloads
File information
File name FULLTEXT01.pdfFile size 2742 kBChecksum SHA-512
fc2a9b60115c2de0d166b0a046ef2212df08fa3e14371079003526eec949e6c5f473217934c22680610e3b9d6629515a5145001f44214b3a2af8aa0233f933b6
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 147 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 203 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf