Characterization of wave slamming forces for a truss structure within the framework of the WaveSlam project
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Civil and Transport Engineering.
2014 (English)MasteroppgaveStudent thesis
Abstract [en]

The foundations of offshore wind turbines in shallow water are predominantly truss structures which are exposed to wave slamming forces. In these situations the design of the structure is governed by high and rapid impacts which usually are larger than Morison forces. These forces depend, among other parameters, on the slamming factor C_s that has been ranged by most researchers between π -2π. So far, several researches about slamming forces have been done for monopod structures, but still a long way to go regarding truss structures. This master thesis is based on the WaveSlam project in which an instrumented multi-membered truss model has been subjected to hundreds of both regular and irregular waves. The experiments have been performed in the large wave flume at FZK Hannover in 2013. The tested structure was equipped with force transducers along the bracings and columns that measured the structure response from the breaking waves. The initial goal of this research project is to characterize the breaking wave forces acting on the front bracings in order to get the slamming factors associated to them. For that purpose the structure tested in Hannover has been modelled and validated in ANSYS (1:8) An initial analysis of the data shows an average time delay in the impact of the wave front. This time delay is around 0.003 s for the points located at the same height in the front bracings. Using the recreation of the truss structure in ANSYS a wave run test is analyzed. Throughout a fitting procedure, the response from ANSYS and from the data are matched with a relative error of 3%.The wave loads have been defined as uniform loads acting along the bracings. The total load duration for those breaking wave loads goes from 0.0049 to 0.007 seconds. These values agree with the expected duration found in the literature. From this initial analysis a slamming factor of Cs= 4.78 is found in the highest part of the front instrumented bracings. The characterization of more breaking wave loads is recommended in order to get an estimate of the largest slamming factor.

Place, publisher, year, edition, pages
Institutt for bygg, anlegg og transport , 2014. , 180 p.
URN: urn:nbn:no:ntnu:diva-25092Local ID: ntnudaim:11734OAI: diva2:730494
Available from: 2014-06-27 Created: 2014-06-27 Last updated: 2014-06-27Bibliographically approved

Open Access in DiVA

fulltext(5970 kB)575 downloads
File information
File name FULLTEXT01.pdfFile size 5970 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(1556 kB)6 downloads
File information
File name COVER01.pdfFile size 1556 kBChecksum SHA-512
Type coverMimetype application/pdf
attachment(101978 kB)12 downloads
File information
File name ATTACHMENT01.zipFile size 101978 kBChecksum SHA-512
Type attachmentMimetype application/zip

By organisation
Department of Civil and Transport Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 575 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 113 hits
ReferencesLink to record
Permanent link

Direct link