Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förstudie -  Nya koncept för ett effektivt flöde
Örebro University, School of Science and Technology.
2014 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesisAlternative title
Feasibility Study - New Concepts for an Effective Flow (English)
Abstract [sv]

Examensarbetet har genomförts på den produktionstekniska avdelningen på Volvo Construction Equipment i Hallsberg.Syftet varatt ta fram ett nytt koncept för hyttsvetsproduktionen på fabriken;hur produktionsprocessen skulle kunna se ut i framtiden. Man vill göra flödet i linan mer effektivt med avseende på kvalitet, flexibilitet samt eliminera tidsslöseri som idag är ett problem.När fabriken påbörjade sin produktionproducerade man två olika varianter av hyttertill anläggningsmaskiner, idag har man ökat produktionen till fyra varianter. I takt med att varianter samt orderingång ökat har man byggt på befintlig produktionslina istället för att utveckla en ny, anpassadlinafördet nya läget. Resultatet har blivit att maxkapaciteten är nådd och linan klarar inte att hantera en planerad produktionsökning.

En grundlig analys av hyttsvetsprocessen, innehållande intervjuer med bland andra platschef, teknisk chef och flera tekniker genfördes för att få förståelse för processen. Övrig information såsom effektivitetsmätningar på utrustning, värdeflödesanalyser och avvikelserapportering har funnits tillgängligt och legat till grund för arbetet. Toyota Production System och Lean har studerats ingående och principermed utgångspunkt ur dessa filosofier hartagits fram. Dessa anser jagsom en viktig grund för en lyckad förändring i produktionen. Principerna behandlar bland annat delarna JIT, Heijunka, eliminera slöseri ochKanban. Dessa återkopplas och integreras i ett nytt koncept innehållande två olika förslag på ny layout för produktionsprocessen.

Abstract [en]

This thesis has been conducted atthe department of production engineering at Volvo Construction Equipment in Hallsberg. The aim was to develop a new concept for cab welding production at the factory, whata future production line could look like. VCE want to make the production flow more efficient in terms of quality, flexibility and eliminate time waste which currently is a problem. When the production first started, the company produced two different types of cabs for construction equipment; today that number has gone up to four types of cabs. As typesof cabsand production increasedone has simply expandedthe existing production line instead of developing a new line, custom built tofitthe newstate. The result is that the maximum capacity is reached and the line cannot handle a planned increase in production.

A thorough analysis of the cab welding process has been conducted containing interviews with, among others, the sitemanager, technical manager and several technicians, to gain understanding of the process. Other information, such as efficiency measurement on equipment, value stream mapping and deviation reports has been available andhasbeen the basis for the thesis. TPS and Lean have been studied extensively and principles based on these philosophies have been developed. These I consider an essential foundation for a successful change in the production. The principles includes, amongst other,JIT,Heijunka, eliminate waste and Kanban. These are reconnectedand integrated into a new concept containing two different proposals for a new layout for the production process.

Place, publisher, year, edition, pages
2014. , 49 p.
Keyword [sv]
TPS, Lean, JIT, processflöde, produktionsutveckling, verkstadslayout
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:oru:diva-35465OAI: oai:DiVA.org:oru-35465DiVA: diva2:727890
Subject / course
Mechanical Engineering
Supervisors
Examiners
Available from: 2014-06-23 Created: 2014-06-23 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

fulltext(2099 kB)263 downloads
File information
File name FULLTEXT01.pdfFile size 2099 kBChecksum SHA-512
e761f7855c07bde8a1a807e8eb103facecbf552db7b4dfa67f060f0544bdb6a596a09601533f0069c98e737c9c094f7319a40b5dc20ea5a3f7b25a8db77f3109
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 263 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 468 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf