Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Energikartläggning enligt ISO 50001: En kartläggning av en industrianläggning för betong
Halmstad University, School of Business and Engineering (SET).
Halmstad University, School of Business and Engineering (SET).
2014 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Den här rapporten har skrivits som en del av ett examensarbete på energiingenjörsprogrammet på Högskolan i Halmstad under våren 2014. Examensarbetet har genomförts i samarbete med AB Färdig Betong samt ÅF Infrastructure AB i Göteborg.

Syftet med projektet är att undersöka energibesparingspotentialen hos AB Färdig Betongs produktionsanläggning på Ringön i Göteborg.

Projektet har inneburit en energikartläggning av en industriell produktionsanläggning för lösbetong. Utgångspunkt för energikartläggningen har varit energiledningssystemet ISO 50001, med målsättningen att ta fram en teknisk energikartläggningsrapport i enlighet med standarden.

Anläggningen har analyserats ur ett energibesparingsperspektiv. Data- och informationsinsamling samt mätningar har genomförts för att ta fram indata som beräkningsunderlag. Genom beräkningar har sedan möjliga energibesparingspotentialer och åtgärdsförslag tagits fram.

Den totala energibesparingspotentialen för anläggningen innebär en besparing på 223 MWh av anläggningens totala energianvändning på 857 MWh år 2013, vilket motsvarar en minskning med omkring 26 %.

Allmänna slutsatser är bland annat att all produktionsutrustning bör placeras inom klimatskalet, att all uppvärmning bör vara temperaturreglerad samt att ett mer långsiktigt energiperspektiv behövs i anläggningen.

Energibesparingsmöjligheterna för anläggningen är mycket goda och investeringskostnaderna är i allmänhet låga.

Abstract [en]

This report has been written as part of a degree project at the Bachelor’s programme in energy engineering at Halmstad University in the spring of 2014. The project was made in collaboration with AB Färdig Betong and ÅF Infrastructure AB in Gothenburg.

The project aims to investigate the potential energy savings of AB Färdig Betong’s production plant at Ringön in Gothenburg.

The project was to make an energy audit of an industrial production plant for concrete. The starting point for the energy audit has been the ISO 50001 energy management system with the aim to develop a technical energy audit report in accordance with the standard.

The plant has been analyzed from an energy perspective. Measurements, collection of data and information has been carried out to develop the input data basis. Through calculations, potential energy savings and proposals for actions were developed.

Among the four largest energy saving potentials, there are two that have no investment cost at all. The total of all potentials represent a saving of 26 % of the total plant energy consumption of 857 MWh in 2013.

General conclusions include that all production should be located within the building, that all heating should be temperature regulated and that a long term perspective on energy use is needed.

Place, publisher, year, edition, pages
2014. , 35 p.
Keyword [en]
energy efficiency, energy audit, ISO 50001, energy saving potentials
Keyword [sv]
energieffektivisering, energikartläggning, ISO 50001, energibesparingsmöjligheter, energieffektiviseringspotentialer
National Category
Engineering and Technology Energy Engineering
Identifiers
URN: urn:nbn:se:hh:diva-25640OAI: oai:DiVA.org:hh-25640DiVA: diva2:725692
External cooperation
AB Färdig Betong
Subject / course
Energy Technology
Supervisors
Examiners
Available from: 2014-06-18 Created: 2014-06-15 Last updated: 2014-06-18Bibliographically approved

Open Access in DiVA

Energikartläggning enligt ISO 50001_Anneli Nilsson, Fanny Hedberg(6531 kB)359 downloads
File information
File name FULLTEXT01.pdfFile size 6531 kBChecksum SHA-512
9ae1a76d2abe12da3f813f68d31420d8b76dcf55b1c4b9791d1f6c5d87778afd976a1fc516eda89015baa0d1feeed868003babf030780e09dec75545aaf6868f
Type fulltextMimetype application/pdf

By organisation
School of Business and Engineering (SET)
Engineering and TechnologyEnergy Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 359 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 453 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf