Materialhantering på byggarbetsplatser: Vilka aktiviteter anser olika arbetsgrupper vara de största problemen beträffande materialhantering?
Karlstad University, Faculty of Health, Science and Technology (starting 2013).
2014 (Swedish)Independent thesis Basic level (university diploma), 15 credits / 22,5 HE creditsStudent thesisAlternative title
Managing materials on construction sites : What activities do different working groups consider to be the main problems concerning the material management? (English)
Abstract [sv]

Hur byggmaterial hanteras på en byggarbetsplats är idag viktigt då materialkostnaden och hanteringen av den står för ca 50 % av byggkostnaderna i ett byggprojekt. Materiallogistiken är inte alltid lätt att hantera då det till ett projekt kommer byggmaterial till många olika yrkesgrupper från många olika leverantörer. Detta examensarbete har skrivits vid Skanska Värmlands byggarbetsplats på Centralsjukhuset i Karlstad där de bygger ut och om sjukhuset till ett beräknat värde av 1,35 miljarder kronor. Där har de stora materialflöden som de vet går att förbättra. Därför ställdes frågorna vilka aktiviteter som är de mest kritiska i materialhanteringen och vilka förändringar som skulle gå att genomföra för att få en effektivare materialhantering, både på den aktuella byggarbetsplatsen och på framtida byggarbetsplatser.

Metoden som valdes för att svara på frågeställningen var en kombination av intervjuer och en fältstudie. Intervjuerna användes för att få fram vilka aktiviteter som olika personer inom organisationen ansåg vara de mest kritiska. De personer som intervjuades var både tjänstemän och yrkesarbetare, och det som alla ansåg var det största problemet på arbetsplatsen var att för stora mängder material hade levererats för tidigt. Det innebär att det lagras i byggnaden vilket gör att materialen ofta står i vägen för yrkesarbetarna. För att validera resultatet gjordes en fältstudie där det granskades hur stor del av arbetstiden som gick åt till att flytta material vilket visade sig vara 38 % av den totala tiden.

För att få till en förbättring och effektivare materialhantering togs fyra förbättringsåtgärder upp:

  • Kör material som inte skall monteras direkt till en logistikcentral för tillfällig lagring.

  • Använd leveranskalendern striktare med hjälp av ett styrdokument.

  • Utvärdera möjligheten att transportera in material under avvikande tider.

  • Starta upp leverantörssamverkan för att få mer tillförlitliga leveranser. 

Abstract [en]

How building materials are managed on a construction site is today important as the cost of materials and the management of it accounts for approximately 50% of the construction costs of a building project. Material logistics is not always easy to deal with when materials come to a project with many different professionals from many different suppliers. This thesis has covered Skanska Värmlands construction site at the Central Hospital in Karlstad, where they expand and rebuild the hospital with an estimated value of 1.35 billion Swedish crones. They are aware of the existing problems with the material flow at the construction site and they know that there are improvements to make. Therefore, the questions were asked which activities are the most critical in the material managing and what changes would be achievable to get an efficient material control, both at the current site and future construction sites.

The chosen methods to answer the question were a combination of interviews and a field survey. The interviews were used to obtain the activities that different individuals within the organization considered to be the most critical. The people interviewed were both civil servants and workers, and what everyone considered was the biggest problem in the workplace was the large amounts of material being delivered prematurely. This means that it is stored in the building, which means that materials often are in the way of the workers. To validate the performance, there was a field study which examined the proportion of working time was spent moving materials which proved to be 38% of the total time.

To make an improvement and to get a more efficient material management four suggestions were made:

  • Material that will not be used within a day or two should be stored in a temporary logistic facility.
  • Use the calendar for deliveries stricter with the help of management policies.
  • Evaluate the ability to transport the material into the building during non-working hours.
  • Cooperation between Skanska and suppliers to get more reliable deliveries. 
Place, publisher, year, edition, pages
2014. , 54 p.
Keyword [sv]
logistik, materialleverans, leverantörssamverkan
National Category
Construction Management
Identifiers
URN: urn:nbn:se:kau:diva-32389OAI: oai:DiVA.org:kau-32389DiVA: diva2:723394
External cooperation
Skanska Värmland
Educational program
Study Programme in Building and Construction Engineering
Supervisors
Examiners
Available from: 2014-06-16 Created: 2014-06-10 Last updated: 2014-06-16Bibliographically approved

Open Access in DiVA

Materialhantering på byggarbetsplatser - Thomas Ivarsson(3505 kB)305 downloads
File information
File name FULLTEXT01.pdfFile size 3505 kBChecksum SHA-512
a9e9d568684d0a790ddc4e7e4f15c6cda896690665e55ff6c1d4be2f3acffac0c48dff409f79a08432a57564cf6f8640d6dd36dbba1b516c30f4aeec473dfd85
Type fulltextMimetype application/pdf
Arkivfil(3497 kB)690 downloads
File information
File name FULLTEXT02.pdfFile size 3497 kBChecksum SHA-512
fe8e90b5a6ed5b6cd155b2f788758ca5b5d4c801eb8fda89ca9457ca5225d889a1075f326bd86a2496c97339044a1128edeaf1ed9955dfe51f5679b15f6c541a
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Ivarsson, Thomas
By organisation
Faculty of Health, Science and Technology (starting 2013)
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 995 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 546 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf