Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Montageplattform: För inredning av två vertikala ventilationsschakt i Garpenbergs gruva
Umeå University, Faculty of Science and Technology, Department of Applied Physics and Electronics.
2014 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The company Bergteamet, Boliden, Sweden, is installing ventilation shafts of the Garpenberg mine. For such work a platform is needed which you can stand on and work from. The Shaft Reinforcement Team at Bergteamet performs the installation work and is the sponsor of the platform. The project described in this report is performed at the department MEC, Mining Equipment Construction, which has been given the task to design and construct the platform, customized for the current shaft. After this the platform is manufactured and inspected at the workshop at Bergteamet.

The design work was carried out as follows:

- After an initial meeting a requirement specification was worked out, describing the problem and previous experiences of platforms and requirements for the design and equipment.

- A concept sketch was developed with consideration of surrounding factors.

- A constructed 3D model was presented along with the choice of materials. Improvements were made after feedback from Bergteamet.

- Development of production drawings. The drawings were reviewed and handed over to the preparer for manufacturing.

 

The result was a platform designed with different square tubes where the floor follows the geometrical shape of the shaft. The platform is suspended from a rectangular center tube with dimensions 100x100x8, which is centered in the shaft. The purpose of a center tube is that it facilitates the final stage of the work in the shaft, namely the installation of a fall protection. The platform has a roof to protect from stone rain and dripping water. Under the floor is an air tank places to run the air-powered outriggers. Around the workplace there is a guardrail with a door for access and egress. The design work was done using the drawing program SolidWorks. Calculations were made by hand.

The platform fulfills the requirements defined by the trade organization for mine elevators in Sweden, (BRAGS), as well as Bolidens for the design and Bergteamets internal design requirements. The platform has been manufactured, inspected and soon filled its purpose for the shaft installation in the Garpenberg mine.

Place, publisher, year, edition, pages
2014. , 41 p.
Series
MA, 1403
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:umu:diva-86583OAI: oai:DiVA.org:umu-86583DiVA: diva2:699904
External cooperation
Bergteamet AB
Subject / course
Maskinteknik
Educational program
Bachelor of Science Engineering in Mechanical Engineering
Supervisors
Examiners
Available from: 2014-03-10 Created: 2014-03-02 Last updated: 2014-03-10Bibliographically approved

Open Access in DiVA

Montageplattform(3092 kB)339 downloads
File information
File name FULLTEXT01.pdfFile size 3092 kBChecksum SHA-512
9e7f4c3c0e5480d01d0adeb81e9699b8672bf632c2ddf3ed397e55e9d378f8bbbd8be38dfb8b123009fa323b896c6d8b3b6d5172e39f98028205c7efee52c1a2
Type fulltextMimetype application/pdf

By organisation
Department of Applied Physics and Electronics
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 339 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 97 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf