Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
EGENKONTROLLER OCH FUKT, EN DEL I KVALITETSARBETET
Örebro University, School of Science and Technology. Örebro universitet.
Örebro universitet.
2013 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
QUALITY CONTROL AND MOUISTURE, A PART IN THE QUALITYWORK (English)
Abstract [sv]

För att kunna garantera hög kvalité på en slutprodukt är det viktigt att kvalitetsarbetet beaktas under produktionen. Kvalitetsarbete påverkar företaget på ett positivt sätt genom att säkerstäl-la nöjda kunder och bidra till både ett gott rykte och en god ekonomi. NCC misstänker att det förekommer bristfälligt kvalitetsarbete under produktion i byggbranschen och gav oss därför i uppdrag att undersöka hur deras arbete med detta fungerar. I examensarbetet har intervjuer gjorts ute på fem av NCC:s pågående projekt i Örebro län för att ge en bild av hur arbetet med egenkontroller och fukt ute på byggarbetsplatserna fungerar. Vi har kartlagt hur arbetstagarna jobbar med egenkontroller och fukt i produktion, om det finns några brister i arbete och i så-dana fall vad det beror på. Kartläggningen visar att upprättningen av mallarna till egenkon-troller behöver förbättras, dels beror det på tidsbrist och NCC:s verksamhetssystem som är begränsat. Det största problemet som de flesta upplever med kvalitetsarbete överlag är att det inte finns tillräckligt med tid för det.

Abstract [en]

To ensure a high quality of the final product it’s important that quality work is considered during the production. Quality work affects the company in a positive way by making our customers happy, improving and retaining our good reputation and leads to a good economy. NCC suspects that there’s insufficient quality work during production in the construction in-dustry across the country and based on that they want us to examine how they’re handling this. In this thesis we’ve done the interviews on five of NCC's ongoing projects in Örebro County in order to provide a picture about how the process of quality controls and moisture at the construction sites works. We’ll identify how employees work with their quality controls and moisture during the production, if there are any deficiencies in the work and in such case what’s causing it.

Place, publisher, year, edition, pages
2013. , 66 p.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:oru:diva-32639OAI: oai:DiVA.org:oru-32639DiVA: diva2:676209
External cooperation
NCC
Subject / course
Construction Engineering
Presentation
2013-06-03, HST, Örebro Universitet, Kumla, 14:30 (Swedish)
Supervisors
Examiners
Available from: 2013-12-06 Created: 2013-12-05 Last updated: 2017-10-17Bibliographically approved

Open Access in DiVA

fulltext(525 kB)347 downloads
File information
File name FULLTEXT01.pdfFile size 525 kBChecksum SHA-512
3d3f58187af7c26ff60cf83ee19c22a45ee36ab73a33c9e1b4ae1ae324f30c4601c8ad17bb91cd5ec73cb62b41247a056e79e49b5c609ec4fd861dc55db54b7c
Type fulltextMimetype application/pdf

By organisation
School of Science and Technology
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 347 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 540 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf