Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Återvinning av asfaltgranulat vid motorvägsbygget på E4, Markaryd: uppföljningar åren 2005-2010
Trafikverket.
Swedish National Road and Transport Research Institute, Infrastructure, Pavement Technology.
2011 (Swedish)Report (Other academic)Alternative title
Recycling of crushed asphalt pavement on highway construction on E4, Markaryd : follow-up period 2005-2010 (English)
Abstract [en]

In connection with the construction of the highway on E4 between Strömsnäsbruk and the county border to Skåne in 2004-2006, about 100 000 tonnes of asphalt were recycled by new technologies according to Swedish standards. These asphalt materials came mainly from those parts of the old E4 with adjoining sections of road that were dug out in connection with the construction of the new road. In the northern part of the object, stage 1, the Swedish Road Administration (SRA) had a permission from the environmental authority to recover about 30 000 tonnes of tar contaminated asphalt by cold recycling with foamed bitumen (asphalt foam). In the southern part of the object, stage 2, about 70 000 tonnes of crushed asphalt pavement (asphalt granulate) were recycled without the addition of new binders. In both cases, the reclaimed asphalt was used as base course under the regular asphalt pavement. It replaced the conventional base course of crushed rock with the same thickness, 80 mm or 150 mm.

This report describes tests with recycling of crushed asphalt pavement (asphalt granules) as base course in stage 2. The road has been followed up during 2006-2010. During the construction phase compaction test was performed and the asphalt material was characterized by laboratory tests. The highway was opened to traffic in June 2006. Wearing course was laid in the summer of 2007.

Place, publisher, year, edition, pages
Linköping: Statens väg- och transportforskningsinstitut, 2011. , 28 p.
Series
VTI notat, 25-2010
Keyword [en]
Bituminous mixture, Recycling, Roadbase, Construction material, Compaction, Properties, Experimental road, Rut, Evenness, Evaluation
National Category
Infrastructure Engineering
Research subject
Road: Materials, Road: Bituminous materials and binders; Road: Highway design, Road: Surfacing
Identifiers
URN: urn:nbn:se:vti:diva-1742OAI: oai:DiVA.org:vti-1742DiVA: diva2:670458
Available from: 2013-12-03 Created: 2013-12-03 Last updated: 2014-09-17Bibliographically approved

Open Access in DiVA

fulltext(577 kB)115 downloads
File information
File name FULLTEXT01.pdfFile size 577 kBChecksum SHA-512
7f9504568fc02ba930c9d975bf62b32d458e4483a10ca4db8d0fe1bfd06ee6031892da61884e553cadcb12bc3c297d999fc1ffdfb69431029b17c97646a3aa01
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Waldemarson, Andreas
By organisation
Pavement Technology
Infrastructure Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 115 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 59 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf