Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Definiera och dokumentera logistikprocesser för kontainerproduktion
Linköping University, Department of Science and Technology. Linköping University, The Institute of Technology.
2005 (Swedish)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesisAlternative title
Define and document logistical processes for shelter production (English)
Abstract [sv]

Denna rapport är ett resultat av ett examensarbete utfört på produktionsenheten NPC Katrineholm inom Ericsson AB. Arbetet kan ses som en del i ett större förändringsarbete involverande fler enheter än de berörda av detta arbete.

Arbetet har gått ut på att förändra ett nuvarande flöde till ett bättre fungerande flöde med förändrad ansvarsfördelning. För att få till stånd det nya flödet har en rad problem varit tvungna att lösas på bästa sätt och informerande av inblandade parter i såväl Katrineholm som på CL Kista som är första kontakt vid en ny order från ett marknadsbolag.

Problem som bearbetats har varit till exempel leveransadresser, materialhantering och godsmärkning. Utöver problemlösning har arbetsinstruktioner och processbilder skapats.

Abstract [en]

This report is a result of a thesis executed at the production unit NPC Katrineholm within Ericsson AB. The work done can be seen as a part of a larger work of change involving other units than the ones mentioned here.

The aim with the work has been to change an existing work flow to an improved and better working flow with a changed distribution of responsibility. To reach an improved work flow, a series of problems has been forced to be solved in the best way possible and to spread the information among involved parts at both NPC Katrineholm and CL Kista, which is the first contact when a new order arrives from a market unit.

The problem which has been worked has been for example delivery address, handling of material and goods marking. Other than problem solving, work instructions and process illustrations has been created.

Place, publisher, year, edition, pages
2005. , 28 p.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:liu:diva-97864ISRN: LITH-ITN-KTS-EX--05/027--SEOAI: oai:DiVA.org:liu-97864DiVA: diva2:651048
Subject / course
Report in Communication and Transport Engineering
Supervisors
Examiners
Available from: 2013-09-24 Created: 2013-09-23 Last updated: 2013-09-25Bibliographically approved

Open Access in DiVA

fulltext(3083 kB)183 downloads
File information
File name FULLTEXT01.pdfFile size 3083 kBChecksum SHA-512
e591debdfc766a3c270d220925d33d2d7c80fc3126570116735cd22e1996b88d5cecc7c3c654f44a781ef5560d9857e34050a3113f1806ced5c46ece81f0f9b2
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Larsson, Patrik
By organisation
Department of Science and TechnologyThe Institute of Technology
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 183 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 76 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf