Dynamic Analysis of a Subsea Module During Splash-zone Transit
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Marine Technology.
2013 (English)MasteroppgaveStudent thesis
Abstract [en]

This thesis carries out a research on the dynamic performance of the template during the lowing operation through splash-zone. During the lifting operation, especially under harsh environment, the waves, winds as well as the currents will leave significant influences on the template. Hence, to study how the template performed under such environmental conditions is the main purpose of this thesis. A brief introduction to the marine operation industry as well as the lifting operation is presented first. During the installation, template is exposed to the magnificent dynamic loads from the environment. So during the lifting process, the forces acting on the template as well as the displacement of the template should be inspected and controlled. Thus, the wave description and an introduction to the different dynamic loads due to the wave movement are performed. In addition, the methodology and the theory background of SIMA program is also included in this thesis. After building up the model of the lifting system in SIMA, the static and dynamic analysis of the lifting operation is performed. The results of the static and dynamic analysis are all listed in the thesis as figures or tables. The finding of the studies shows that the template experiences a significant drift in the wave induced direction for all sea-states. Besides, the dynamic load of the lifting lines can be more than twice than the static load. This will lead to a huge challenge to the capacity of the lifting wires. Additionally, the vertical motion of the template is sufficient large during the lifting operation and may lead to potential risk. Overall, the environmental conditions have magnificent influences on the lifting structures. In particular, lifting operations must not take place once the significant wave height exceeds an up-limitation. On the meantime, the lifting action needs to be paused if the wave peak period is approaching a critical value.

Place, publisher, year, edition, pages
Institutt for marin teknikk , 2013. , 108 p.
URN: urn:nbn:no:ntnu:diva-22275Local ID: ntnudaim:9434OAI: diva2:648730
Available from: 2013-09-16 Created: 2013-09-16 Last updated: 2013-09-16Bibliographically approved

Open Access in DiVA

fulltext(6837 kB)2983 downloads
File information
File name FULLTEXT01.pdfFile size 6837 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)11 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf
attachment(7747 kB)2022 downloads
File information
File name ATTACHMENT01.zipFile size 7747 kBChecksum SHA-512
Type attachmentMimetype application/zip

By organisation
Department of Marine Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 2983 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 184 hits
ReferencesLink to record
Permanent link

Direct link