Reliability Qualification of Safety Systems in the Offshore Petroleum Industry
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Productions and Quality Engineering.
2013 (English)MasteroppgaveStudent thesis
Abstract [en]

This master thesis starts off by providing basic knowledge about relevant well type, well equipment, gas lift and well barriers. This is basic knowledge which is needed to understand the systems investigated throughout the rest of the thesis. Four annulus barrier configurations are found for gas lift systems. Their maintenance strategies are briefly described and general advantages and disadvantages are listed. Well barrier diagrams and well barrier schematics are also provided for each configuration. The terms safety instrumented systemand safety instrumented function are briefly explained. Governing regulations regarding barriers are provided both forNorway and for theUnited States of America. Requirements regarding safety instrumented system and annulus well barriers in Norway follow. These include requirements for documentation. The safety analysis report (SAR) process is described both for non-proven and proven technology. This process and the included documentation vary for whether the components are certified as proven in use or prior use. The required documentation is also dependent on the system complexity. Relevant terms are discussed. Flowcharts for the various SAR processes are made for both non-proven and proven technology based on the OLF 070 guideline. Two case studies are used to describe the SAR process and to compare the process for non-proven versus proven technology. Some challenges when performing SAR are found and discussed. Potential improvements to the OLF 070 guideline and to IEC standards are also proposed. Probability of unavailability (PFD) calculations are provided for each of the gas lift configuration options based on the well barrier schematics and the well barrier diagrams. The results are discussed and an overall assessment of these configurations is made. The result shows that three of the options can be recommended. The option with three barrier elements has slightly better reliability than the most used gas lift configuration which only includes two barriers. A system weakness is reviled and an improvement proposed. The suggested improvement proves increased system reliability which resulted in recommendation of all four configurations options. A specified configuration is recommended not to be used. However, the suggested improvement may not be used in practise due to blocking of monitoring. Another improvement is suggested and analysed, but showed minor changes.

Place, publisher, year, edition, pages
Institutt for produksjons- og kvalitetsteknikk , 2013. , 147 p.
URN: urn:nbn:no:ntnu:diva-22222Local ID: ntnudaim:10094OAI: diva2:648677
Available from: 2013-09-16 Created: 2013-09-16 Last updated: 2013-09-16Bibliographically approved

Open Access in DiVA

fulltext(12651 kB)828 downloads
File information
File name FULLTEXT01.pdfFile size 12651 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)22 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf

By organisation
Department of Productions and Quality Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 828 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 496 hits
ReferencesLink to record
Permanent link

Direct link