Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Påverkan av överprövningar vid offentlig upphandling: Belysa de konsekvenser som en överprövning frambringar ur ett samhälls- och projektperspektiv
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
KTH, School of Architecture and the Built Environment (ABE), Civil and Architectural Engineering, Building Technology and Design.
2013 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Effects of the appeal procedure due to a public procurement : Highlighting the impacts of an appeal procedure generates from a societal- and project-perspective (English)
Abstract [sv]

I och med den nya globala ekonomin blir det allt mer vanligt med en ökad konkurrens. Inte enbart från den inhemska marknaden utan även via en global marknad som öppnats genom ett samarbete mellan nationer i Europa. Därmed finns en större tendens från företagen att dra en offentlig upphandling inför det svenska rättssystemet och bestrida beslutet som fattats av den upphandlande myndigheten då varje upphandling blir viktig att vinna. En tydlig orsak till det ökande antalet överprövningar är att i och med en regression i den globala ekonomin och med kollapser av nationella ekonomier runt om i världen så finns det en ökad vinning i att överpröva en förlorad upphandling då dessa är bristvara vid lågkonjunktur. Genom detta examensarbete kommer uppsatsförfattarna att belysa de problem och grunder som finns för att en överprövning skall uppstå som till exempel den allt för korta granskningstiden av tilldelningsbeslut, en saknad kompetens för en upphandling och möjligtvis ett allt för konservativt arbetssätt i det svenska rättsväsendet. Denna rapport kommer även att belysa de problem som en överprövning medför då ett projekt blir drabbat. Detta kan vara saker som en ökad budget på grund av omplanering vid en tidsfördröjning, svenska skattemedel används för att bearbeta de merarbeten som en överprövning frambringar. Även hur det skulle påverka en tredje-man och vilka konsekvenser det skulle få för hen.

Abstract [en]

Due to the more open global economy, it’s more common with an increased competition between companies. Not only from a domestic market. But also from a global market that opened through a collaboration between nations in Europe. Thus, there is a greater inclination for companies to take a tender through the legal system to dispute the decision of the contracting authority. One of the reasons for the increasing number of lawsuits is the regression of the global economy and collapse of national economies around the globe. Therefore it is an increased gain to review the loss of a contract, due to the regression in the market. This thesis will highlight issues and backgrounds for that an appeal shall arise, such as “the way to” short examination time of the assignment decision. The absent of required skills for procurement process and its complications. And the overly conservative approach in the Swedish legal system. This report will also explore the problem that a lawsuit brings to a project. For example an arising budget due to re-planning, Swedish tax-payers money is used to process the extra amount of work that appeal processes generate. But also how it would affect third parties such as a daily commuter and which consequences it would bring forth for them.

Place, publisher, year, edition, pages
2013. , 54 p.
National Category
Civil Engineering
Identifiers
URN: urn:nbn:se:kth:diva-126999OAI: oai:DiVA.org:kth-126999DiVA: diva2:643151
External cooperation
Vectura Consulting AB & Trafikverket
Educational program
Bachelor of Science in Engineering - Constructional Engineering and Design
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-08-26 Created: 2013-08-26 Last updated: 2013-08-26Bibliographically approved

Open Access in DiVA

fulltext(1531 kB)614 downloads
File information
File name FULLTEXT01.pdfFile size 1531 kBChecksum SHA-512
454dd6cde19a05aee9be08691e68464aa13791654d01c02487fc6947a8496ab3d9ed4c849f35570bcf4687483a381bb6d8b93014033007b513c533ab96946ba1
Type fulltextMimetype application/pdf

By organisation
Building Technology and Design
Civil Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 614 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 325 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf