Change search
ReferencesLink to record
Permanent link

Direct link
SMED implementation vid slipoperation
Uppsala University, Disciplinary Domain of Science and Technology, Technology, Department of Engineering Sciences, Industrial Engineering & Management.
2013 (Swedish)Independent thesis Basic level (professional degree), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The thesis has investigated how Sandvik Coromant could implement the SMED principle on one of their grinders groups and what improvements it would lead to. The aim of the thesis is to identify the current situation and investigate how their setup times would be affected by SMED. The work initiated with a literature analysis about the SMED principles and then proceeded with an analysis of the current situation where the activity was time mapped. The analysis consisted of time trials of the process that the thesis would include. The time studies revealed opportunities for structural improvements to create environment for a more structured process. Conversations and interviews with operators during the studies and monitoring of the processes generated a number of improvement opportunities. When improvement suggestions were generated and priorities of which was to be implemented, Sandvik Coromant gave the implementation of principal improvement proposals the highest priority The work continued in that direction and took out routines and suggestions on an updated workplace. This has generated verified set-up time reductions of 68% in the most time consuming process. The improvements that have been implemented during the thesis has not reduced set-up time to under ten minutes but if the client implements all components of the action plan, the time will be approached. Besides looking at setup time the order change process has been examined and there are parts of that process that can be streamlined. To implement the suggested changes will create opportunities to reduce the order replacements time by over 70%. This means substantial savings for Sandvik Coromant. Even if only a part of the improvement proposals will be implemented it will lead to drastic improvements with average setup time reduced drastically.

Place, publisher, year, edition, pages
2013. , 33 p.
Keyword [sv]
SMED, ställtidsreducering
National Category
Mechanical Engineering
URN: urn:nbn:se:uu:diva-205364ISRN: UTH-INGUTB-EX-M-2013/14-SEOAI: diva2:641357
External cooperation
Sandvik Coromant
Educational program
Bachelor Programme in Mechanical Engineering
2013-06-05, Ångströmslaboratoriet, Uppsala, 13:27 (Swedish)
Available from: 2013-08-16 Created: 2013-08-16 Last updated: 2013-08-16Bibliographically approved

Open Access in DiVA

fulltext(1579 kB)239 downloads
File information
File name FULLTEXT01.pdfFile size 1579 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Lindkvist, Christoffer
By organisation
Industrial Engineering & Management
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 239 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 579 hits
ReferencesLink to record
Permanent link

Direct link