Utilization of Planning and Design Data in Drilling Automation and Model Based Process Control on Statfjord
Norwegian University of Science and Technology, Faculty of Engineering Science and Technology, Department of Petroleum Engineering and Applied Geophysics.
2013 (English)MasteroppgaveStudent thesis
Abstract [en]

Drilling of oil wells has through time become increasingly difficult due to less accessible oil and depleted reservoirs. Well stability issues and other drilling problems are frequently experienced during drilling of challenging wells, resulting in large costs related to non-productive time. Automated drilling systems are developed to reduce excessive costs from non-productive time through model based process control. The automated drilling system “Drilltronics” is selected for first use implementation of automated drilling at the Statoil operated Statfjord oil field in the North Sea. Model based process control systems such as Drilltronics uses advanced dynamic wellbore models to monitor the well during the drilling process and to take control of the operation if necessary to prevent incidents. Drilltronics continuously safeguards the well and provides safety triggers by comparing formation parameters to expected modeled values for the drawworks, the top drive and the mud pumps. Some functions of Drilltronics have already been tested in a pilot at Statfjord C with promising results, but some challenges related to data management, data quality and work processes were discovered. Real-time measured data can to some degree be controlled by the use of redundant sets of sensors, but system configuration data may be more challenging to both collect and verify. This thesis suggests how planning and design data can be utilized as system configuration data in the implementation of Drilltronics on Statfjord. Challenges related to the quality of available planning and design data are also studied, in addition to challenges related to work processes. The result of the analysis indicates that the quality of current planning and design data may be insufficient as input for model based process control. A suggestion for the utilization of actual data instead of or in addition to planning data is proposed, which will take advantage of offshore data acquisition and verification. Consequently there is a need for establishment of new work processes offshore with the implementation of Drilltronics. Suggestions to new work processes are presented.

Place, publisher, year, edition, pages
Institutt for petroleumsteknologi og anvendt geofysikk , 2013. , 138 p.
URN: urn:nbn:no:ntnu:diva-21615Local ID: ntnudaim:9322OAI: diva2:640183
Available from: 2013-08-12 Created: 2013-08-12 Last updated: 2013-08-12Bibliographically approved

Open Access in DiVA

fulltext(3531 kB)1607 downloads
File information
File name FULLTEXT01.pdfFile size 3531 kBChecksum SHA-512
Type fulltextMimetype application/pdf
cover(184 kB)18 downloads
File information
File name COVER01.pdfFile size 184 kBChecksum SHA-512
Type coverMimetype application/pdf

By organisation
Department of Petroleum Engineering and Applied Geophysics

Search outside of DiVA

GoogleGoogle Scholar
Total: 1607 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 91 hits
ReferencesLink to record
Permanent link

Direct link