Analysis and performance measurement of construction logistics
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, The Institute of Technology.
Linköping University, Department of Science and Technology, Communications and Transport Systems. Linköping University, The Institute of Technology.
2013 (English)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Analys och utvärdering av logistik vid byggandet av kvarteret Spinnrocken i Norrköping (Swedish)
Abstract [en]

The construction industry is a business with an intense flow of both material and information that require well-functioning logistics in order to not suffer from unnecessarily high costs. Suppliers play a big part regarding the costs of the distribution and handling of material and due to this a construction project’s costs are affected a great deal by the suppliers’ actions. Spinnrocken is a construction project in the town center of Norrköping. The real estate company Fastighets AB L E Lundbergs is the client and the construction company Skanska is contracted as sole constructor for the project. Spinnrocken is planned to be finalized in the summer of 2014 and consists of several rental-apartments and some smaller businesses. Spinnrocken and its central location result in major logistic challenges, because of this Lundbergs and Skanska want to analyze and evaluate the project’s logistic performance. The main purpose of this thesis is to measure the order fulfillment of interior materials, the scaffold material Doka and windows at Spinnrocken by using the so-called perfect order fulfillment measure, as defined in Supply Chain Operations Reference Model. Perfect order fulfillment indicates the delivery performance to the construction site.The combined perfect order fulfillment for the three investigated materials is 18 %. A perfect order fulfillment of 18 % means that only one out of five inspected deliveries to Spinnrocken was considered having no faults at all. The effects of a low perfect order fulfillment are disruptions in the short-term time schedule, delayed operations, additional work and that the work space at the construction site is occupied by unnecessary construction material. The resulting effects thereby affects the project’s economy negatively.

Place, publisher, year, edition, pages
2013. , 45 p.
Keyword [en]
Bygglogistik, logistics, perfect order fulfillment, leveransprecision, logistik, Spinnrocken, SCOR, Supply Chain Operations Reference Model, Construction logistics, Lundbergs, Skanska, Fastighets AB L E Lundbergs
National Category
Transport Systems and Logistics
URN: urn:nbn:se:liu:diva-95236ISRN: LiU-ITN-TEK-G--13/029--SEOAI: diva2:635176
Subject / course
Logistics Management
Available from: 2013-07-03 Created: 2013-07-03 Last updated: 2013-07-03Bibliographically approved

Open Access in DiVA

fulltext(1693 kB)1529 downloads
File information
File name FULLTEXT01.pdfFile size 1693 kBChecksum SHA-512
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Lohm Isberg, MaximilianOlsson, David
By organisation
Communications and Transport SystemsThe Institute of Technology
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar
Total: 1529 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 1582 hits
ReferencesLink to record
Permanent link

Direct link